My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Quotes - 2020 Signal Knock-Down and Wiring Investigation Proj No. 119-110 - Pemberton Davis Electric, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Quotations/Proposals
>
Opening of Quotes - 2020 Signal Knock-Down and Wiring Investigation Proj No. 119-110 - Pemberton Davis Electric, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 1:44:19 PM
Creation date
12/23/2019 11:17:14 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
32
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Demand Reset Door <br />w/6'k6" Lexan Viewing <br />wlndmv <br />Ir <br />Ground <br />g. 34.00" 1 <br />SECTION 6 - TRAFFIC AND LIGHTING <br />Meter Socket w/ Box <br />Landis & GVR 40007-01 <br />w/ Barriers <br />17.38" <br />SIDE VIEW PANEL SIDE VIEW <br />(Pull SeCt6on ver Removed) <br />Section Thru Metering Compartment <br />34.00"(Dual) <br />30.00" (Single) <br />Q 2.00" <br />f...... <br />2606 <br />l l 4 <br />u ' <br />0 <br />CITY BASE DETAIL NOTES <br />—_ <br />Base Musa be 34"w X 30' h M 22' d <br />" <br />12" (of 30") Must be Exposed Above Ground <br />18" (of 30") Must be Below Ground <br />l I <br />} <br />22.95" <br />5 27" <br />PANEL BASE PLAN <br />iEi ENCLOSURE CONSTRUCTION NOTES: <br />2 ga. H.D. gals. steel and interior 14 ga. cold rolled steel electrically welded i. <br />reinforced where required, <br />2. Construction will be NEMA 3R, raintight, <br />3. All nuts, bolts and screws will be stainless steel. <br />4. Nuts, bolts & screws will not be visible from outside of enclosure. <br />5. Nameplates will be provided as required. <br />6. Control wiring will be marked at both ends by permanent wire markers, <br />7. A plastic covered wiring diagram will be attached to the inside of the front door. <br />B. Enclosure will be factory wired and conform to required NEMA and UL 508A standards. <br />9. Color to be: Char Brown or as specified by Engineering Department. <br />REF STD SPEC SEC 6-2 <br />APPROVED/REVISED BY THE BOARD OF PUBLIC WORKS <br />EFFECTIVE DATE: June 26, 2018 <br />Item I Revision Approved Date <br />,. 6/26/18 <br />P,E. Date <br />CITY OF SOUTH BEND <br />STANDARDS FOR DESIGN <br />AND CONSTRUCTION <br />SERVICE POINTS - SINGLE METER (CABINET AND FOUNDATION STANDARD <br />DETAILS) 6-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.