My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Lateral Proposals - Metronet Buildout for Six (6) Locations – ChoiceLight, Inc. (formerly Metronet Zing)
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Lateral Proposals - Metronet Buildout for Six (6) Locations – ChoiceLight, Inc. (formerly Metronet Zing)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:49:57 PM
Creation date
12/23/2019 11:01:38 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
10
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
eight <br />Lateral Proposal <br />City of South Bend <br />227 W. Jefferson #1200N <br />South Bend, Indiana, 46601 <br />2000 Wall St., South Bend <br />Proposal for new conduit and fiber at Potawatomi Pool: <br />• Install 2" HDPE from Wall, East. <br />• Install new Corning SM fiber. <br />• Install (2) new handholes. <br />• Install new fiber patch panel. <br />• Install new splice enclosure. <br />• Splice strands to backbone. <br />• Test and label. <br />• Proposal does not include Indiana sales tax. <br />ChoiceLight,Inc. <br />130 S. Main St. Suite 275 <br />South Bend, IN 46601 <br />December 6, 2019 <br />D13-1219 <br />We hereby propose to furnish material and labor in complete accordance with the above <br />specifications for the sum of $ 19,450 (Nineteen Thousand Four Hundred Fifty Dollars) <br />All materials are guaranteed to be as specified. All work to be completed in a satisfactory <br />manner according to standard practices. Any alteration or deviation from the above <br />specifications or involving extra costs will be executed only upon written orders and will become <br />an extra charge over and above this proposal. All agreements are contingent upon strikes, <br />accidents, or delays beyond our control. The Owner will carry fire, tornado, and other necessary <br />insurance. Our workers are fully covered by Worker's Compensation Insurance. This proposal is <br />valid for 30 days from issue date. <br />ACCEPTANCE OF PROPOSAL <br />The above prices, specifications, and conditions are satisfactory and are hereby accepted. Choicel-ight, <br />Inc. is authorized to do the work as specified. Payment will be made as stated above. <br />The undersigned person executing this Proposal represents and certifies that he/she is a duly authorized <br />officer with authority to execute this Proposal and has the full legal rights, power and authority to enter <br />into this Proposal and to grant the rights and perform the obligation herein; that no third party consent or <br />approval is required to grant such right or perform such obligations hereunder. <br />Signature: i o F t_ _. _� Date <br />r <br />��II Ilio�i.i n, <br />
The URL can be used to link to this page
Your browser does not support the video tag.