Laserfiche WebLink
1:'urn4'N4 N Ids. <br />A 0 :y <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 118-010A Project Name: Historic Leeper Park Improvements Change Order #: 4 <br />MMM� <br />DATE INITIATED: 11/21/2019 BPW DATE: <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Install water meter & RPZ valve- per Water Works' directive ($1,788.50) <br />Install handrails for "Historic Steps" ($10,377.00) <br />Attachments: (List documents support change — required) <br />Contractor quotes <br />Amount of Blncrease / ❑Decrease: $ 12,165.50 <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 64,685.33 B Scope of Work <br />El Differing Site Conditions, Changed Conditions <br />Current Percent of Change: 0'89 <br />❑ Conflicted Specifications and Drawings <br />El Failed Materials <br />New Total Amount: $ 1,384,979.86 <br />— ❑ Error <br />El Omission <br />Total Percent of Change: 5.87 <br />❑ Final Quantity Adjustment <br />Funding Secured From: __ „ <br />0 <br />(filled out by PM) <br />RECOMMENDED BY: <br />Greg McGowan �.�..�^ 12/16/19 <br />Project Inspector (Print Name) (Signature) (Date) <br />REVIEWED BY: <br />dl+144-7-19 <br />Construction Ma ger (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Engineering Project Manager (Print Name) (Signat) (Date) <br />APPROVED BY: <br />CityEnineer(rinn <br />) (Signatc ) (Dat ) <br />