My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Small Drainage Design and Repair – Sampson and Overlook – Proj No. 118-063A - HRP Construction Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Award Bids
>
Award Bid - Small Drainage Design and Repair – Sampson and Overlook – Proj No. 118-063A - HRP Construction Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:40:33 AM
Creation date
12/23/2019 10:45:30 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/19/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
57
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENVIRONMENTAL SERVICES <br />TO: Members of the Board of Public Works <br />Clara McDaniels, Assistant City Attorney Public Works <br />Linda M. Martin, Clerk <br />FROM: Sue Ellen Doudrick, P.E., Assistant City Engineer <br />SUBJECT: Project No. 118-063A Small Drainage Design & Repair: Sampson Street <br />& Overlook Court <br />DATE: December 19, 2019 <br />OW8h1V�WPOM9tlM WI�WWllU !W 48uW�01�4VWVNONSM�il�llll Uui�wwrtWiuwl IYIYIIIIYOOOOO�OOOOfffff�fffff000000000 i00001M�0�011WmmMOMOM� <br />On December 10, 2018, the Board of Public Works opened and read bids for the above project. <br />The Division of Engineering the documents and found the information correct and complete. <br />The project included Division A and an alternate, which could be awarded to the lowest, <br />responsive, responsible, pre -qualified bidder. The project will be awarded to the highlighted <br />contractors shown below: <br />......................_.................... .... ...................._. --- <br />Bidder ___.. <br />Division A Alternate 1 Total <br />1. HRP $182,257.00 $38,923.00 $224,180.00.................. <br />8,021.1 <br />2. Selge Construction $24 _.._ _.3 _.................. .. 0 $34,542.80 $282,563.90 <br />The Division of Engineering recommend the award of contract for Project No. 118-063A <br />Small 1:irainapie Design & Repair: Sampson Street and Overlook Court to the lowest, <br />responsive, responsible, pre -qualified bidder, HRP Construction at the bid price highlighted <br />above for Division A and Alternate 1. This award is based on acquiring an easement for the <br />storm sewer, which the parcel owner has agreed upon. <br />The project will be funded from 251-0608-431.42-96 LRSA Major Capitol. The bid tabulation for this <br />project is attached. <br />For questions regarding the above recommendation or the subject project, contact Sue Ellen <br />Doudrick (Ext. 5922) at the Division of Engineering. <br />
The URL can be used to link to this page
Your browser does not support the video tag.