My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - Olive Street Road Reconstruction Inspection Project - HWC Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
PSA - Olive Street Road Reconstruction Inspection Project - HWC Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 8:50:30 AM
Creation date
12/12/2019 10:49:02 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Version 6-8-2017 <br />submitted to: <br />City of South Bend <br />Department of Public Works <br />227 W. Jefferson Blvd., Suite 1316 <br />South Bend, IN 46601 <br />2. The claim vouchers shall represent the value to the Local Public Agency (LPA) of <br />the partially completed work as of the date of the claim voucher. When submitting <br />a claim voucher, the CONSULTANT shall furnish a copy of records showing the <br />individuals who worked on this Contract during the month, their classification, <br />the number of hours worked since the last claim voucher was submitted, and the <br />hourly rate. <br />If the LPA does not agree with the amount claimed by the CONSULTANT on a <br />claim voucher, the LPA will send the CONSULTANT a letter by regular mail and <br />list the differences between actual and claimed progress. The letter will be sent to <br />the CONSULTANT's address on page 13 of this Contract or the <br />CONSULTANT's last known address. <br />4. If, prior to the satisfactory completion of the services under this Contract, the total <br />of the direct and indirect costs incurred by the CONSULTANT is within ten <br />percent (10%) of the maximum amount payable, the CONSULTANT shall notify <br />INDOT and the status will be evaluated. <br />26 <br />
The URL can be used to link to this page
Your browser does not support the video tag.