My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - River Walk from Beyer Street to Howard Park Proj No 117-083A - Walsh & Kelly, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - River Walk from Beyer Street to Howard Park Proj No 117-083A - Walsh & Kelly, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:49:30 AM
Creation date
12/12/2019 10:31:39 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
64
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
5. List references from private firms for which you have performed work. <br />Gatlin Plunibi.ng & Heatilll lnc• 1 l 1 E. Main t., ri'f `:ttlzl IN "is. ;Tara lt,irph _........ <br />Qcau-g ,. L1c _. 00 E. "' r., nilivfll � IN 64,1 ._ r, Ra mold Gou rh <br />D er Construction Co. 1716 Sheffield Avenue Dyer, IN Janet Furman <br />Grimmer Construction Co. Inc. 2619 Main Street Highland, IN Mr. Gre Grimmer <br />SECTION II PLAN AND EQUIPMENT QUESTIONNAIRE <br />1. Explain your plan or layout for performing proposed work. (Examples could include a narrative of when you could <br />begin work, completed the project, number of workers, etc. and any other information which you believe would <br />enable the governmental unit consider your bid.) <br />As required by owner <br />2. Please list the names and addresses of all subcontractors (i.e. persons or firms outside your own firm who have <br />performed part of the work) that you have used on public works projects during the past five (5) years along with a <br />brief description of the work done by each subcontractor. <br />See Attached List <br />3. If you intend to sublet any portion of the work, state the name and address of each subcontractor, equipment to be <br />used by the subcontractor, and whether you will require a bond. However, if you are unable to currently provide a <br />listing, please understand a listing must be provided prior to contract approval. Until the completion of the proposed <br />project, you are under a continuing obligation to immediately notify the governmental unit in the event that you <br />subsequently determine that you will use a subcontractor on the proposed project. <br />Will supply upon award of contract <br />4. What equipment do you have available to use for the proposed project? Any equipment to be used by subcontractors <br />may also be required to be listed by the governmental unit. <br />QUANTITY <br />ITEM <br />DESCRIPTION, <br />CONDITION <br />YEARS <br />........................... <br />_____._______..__...P.--..___T_. <br />RESENLOCATION <br />SIZE, CAPACITY, <br />OF <br />_.__ .... <br />............................................... ......... ..... <br />ETC. <br />....... .... ..._..... <br />SERVICE <br />5 <br />Asphalt Plants <br />Various <br />Good <br />Griffith, South Bend, <br />Valparaiso, Lowell, LaPorte <br />19 <br />Aspat Pavers <br />Various <br />Good._._______ <br />Griffith, South Bend <br />4 <br />Sli form Conc. PaverFCAT/J.D. <br />s <br />Good <br />Griffith, South Bend <br />3 <br />Road Widener <br />s <br />Good <br />..�............................-.�.-................................................................. <br />Griffith, South Bend <br />....... ....... _. .... <br />5 <br />. .............. <br />Motor Graders <br />D. <br />Good <br />Griffith, South Bend <br />54 _ <br />Rollers <br />m . �._._._. <br />s <br />..........._____.. .30 <br />Good <br />Griffith, South Bend <br />Rubber Tire Loaders <br />s <br />Good <br />Griffith, South Bend <br />15 <br />Excavators <br />Various <br />Good <br />Griffith, South Bend <br />9 <br />Bulldozers <br />Various <br />Goodmm <br />_._._. <br />Griffith, South Bend <br />6 <br />LowBoy Tractors <br />Various <br />Good <br />Gr <br />8 <br />........ <br />Flatbed Du <br />...... <br />Various <br />Good <br />. ........ ........ ....... <br />Griffith, South Bend <br />48 <br />1 3 <br />/2 and / ton PicKu s <br />Various <br />Good <br />Griffith, South Bend <br />65 <br />1 Ton Crew Trucks <br />Various <br />Good <br />Griffith, South Bend <br />3 <br />....... ............._._.�._._. <br />Cold Planers <br />_ <br />Wirtgen 1900 <br />Good <br />Griffith, South Bend <br />DC <br />3 <br />Tri-Axle Dump <br />Mack <br />Good <br />South Bend <br />5. Have you entered into contracts or received offers for all materials which substantiate the prices used in preparing <br />your proposal? Otherwise, please explain the rationale used which would corroborate the prices listed. <br />Yes, we received quotes from potential subcontractors and suppliers <br />SECTION III CONTRACTOR'S FINANCIAL STATEMENT <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.