BID/PROPOSAL Addendum No. 2
<br />CITY OF SOUTH BEND
<br />47.
<br />4-1/c No. 8 Copper Cable
<br />2,970
<br />LIFT
<br />$ 3.20
<br />$9,504.00
<br />48.
<br />1 1/2" PVC Schedule 80 for Lighting
<br />2,080
<br />LIFT
<br />$ 8.76
<br />$18,220.80
<br />49.
<br />1 1/2" PVC Schedule 80 for Lighting, in Pile Cap
<br />510
<br />LFT
<br />$ 12.00
<br />$6,120.00
<br />50.
<br />1 1/2" PVC Schedule 80 for Lighting, Directionally Bored
<br />380
<br />LIFT
<br />$ 10.54
<br />$4,005.20
<br />51.
<br />Light Pole Foundation
<br />29
<br />EACH
<br />$ 790.00
<br />$22,910.00
<br />52.
<br />Light Pole and Luminaire, LED, Pedestrian Light, Furnish
<br />2
<br />EACH
<br />$ 6,400.00
<br />$12,800.00
<br />53.
<br />ILight Pole and Luminaire, LED, Pedestrian Light, Furnish
<br />and Install
<br />35
<br />EACH
<br />$ 6,540.00
<br />$228,900.00
<br />54.
<br />TESCO Combination Cabinet and Foundation
<br />1
<br />EACH
<br />$ 7,140.00
<br />$7,140.00
<br />55.
<br />Miscellaneous Equipment for Lighting
<br />1
<br />LS
<br />$ 6,457.00
<br />$6,457.00
<br />56.
<br />Transverse Pavement Marking, Paint, Stop Line, 24"
<br />11
<br />LIFT
<br />$ 15.90
<br />$174.90
<br />57.
<br />Pavement Marking, Solid, Green
<br />360
<br />SIFT
<br />$ 24.90
<br />$8,964.00
<br />58.
<br />Hardwood Mulch
<br />60
<br />CYD
<br />$ 68.00
<br />$4,080.00
<br />Division 2: Upper Walk $1,816,490.00
<br />Division 3: Lower Walk
<br />Item
<br />No.
<br />Description
<br />ntit
<br />Unit
<br />Unit Price
<br />Total Amount
<br />1,
<br />Construction Engineering
<br />1
<br />LS
<br />$ 6,400.00
<br />$6,400.00
<br />2.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />$ 29,000.38
<br />$29,000.38
<br />3.
<br />Concrete Sidewalks and Approaches, Remove
<br />810
<br />SYD
<br />$ 58.00
<br />$46,980.00
<br />4.
<br />Light Pole and Foundation, Remove
<br />28
<br />EACH
<br />$ 830.00
<br />$23,240.00
<br />5.
<br />Tree, Remove, over 24" to 36"
<br />1
<br />EACH
<br />$ 2,800.00
<br />$2,800.00
<br />6„
<br />Tree, Remove, over 36" to 60"
<br />2
<br />EACH
<br />$ 3,500.00
<br />$7,000.00
<br />7.
<br />Common Excavation
<br />50
<br />CYD
<br />$ 106.00
<br />$5,300.00
<br />8.
<br />"B" Borrow
<br />50
<br />CYD
<br />$ 75.00
<br />$3,750.00
<br />9.
<br />Temporary Erosion Control, Silt Fence
<br />910
<br />LIFT
<br />$ 6.00
<br />$5,460.00
<br />10.
<br />Temporary Erosion Control
<br />1
<br />LS
<br />$ 1.00
<br />$1.00
<br />11.
<br />Sidewalk, Concrete, 4"
<br />120
<br />SYD
<br />$ 63.00
<br />$7,560.00
<br />12.
<br />Sidewalk, Stamped Concrete with Integral Color, 5"
<br />60
<br />SYD
<br />$ 412.00
<br />$24,720.00
<br />13.
<br />Landscape Edging, Aluminum, Black
<br />80
<br />LIFT
<br />$ 7.25
<br />$580.00
<br />14.
<br />Tree, Red Maple, 2.5"
<br />3
<br />EACH
<br />$ 620.00
<br />$1,860.00
<br />15.
<br />16.
<br />Tree, Commemoration Sugar Maple, 2.5"
<br />Tree, American Hornbeam, 2.5"
<br />2
<br />2
<br />EACH
<br />EACH
<br />$ 620.00
<br />$ 682.50
<br />$1,240.00
<br />$1,365.00
<br />Version 1/17/2019 Contractor's Bid for Public Works - 9