Laserfiche WebLink
BID/PROPOSAL Addendum No. 2 <br />CITY OF SOUTH BEND <br />47. <br />4-1/c No. 8 Copper Cable <br />2,970 <br />LIFT <br />$ 3.20 <br />$9,504.00 <br />48. <br />1 1/2" PVC Schedule 80 for Lighting <br />2,080 <br />LIFT <br />$ 8.76 <br />$18,220.80 <br />49. <br />1 1/2" PVC Schedule 80 for Lighting, in Pile Cap <br />510 <br />LFT <br />$ 12.00 <br />$6,120.00 <br />50. <br />1 1/2" PVC Schedule 80 for Lighting, Directionally Bored <br />380 <br />LIFT <br />$ 10.54 <br />$4,005.20 <br />51. <br />Light Pole Foundation <br />29 <br />EACH <br />$ 790.00 <br />$22,910.00 <br />52. <br />Light Pole and Luminaire, LED, Pedestrian Light, Furnish <br />2 <br />EACH <br />$ 6,400.00 <br />$12,800.00 <br />53. <br />ILight Pole and Luminaire, LED, Pedestrian Light, Furnish <br />and Install <br />35 <br />EACH <br />$ 6,540.00 <br />$228,900.00 <br />54. <br />TESCO Combination Cabinet and Foundation <br />1 <br />EACH <br />$ 7,140.00 <br />$7,140.00 <br />55. <br />Miscellaneous Equipment for Lighting <br />1 <br />LS <br />$ 6,457.00 <br />$6,457.00 <br />56. <br />Transverse Pavement Marking, Paint, Stop Line, 24" <br />11 <br />LIFT <br />$ 15.90 <br />$174.90 <br />57. <br />Pavement Marking, Solid, Green <br />360 <br />SIFT <br />$ 24.90 <br />$8,964.00 <br />58. <br />Hardwood Mulch <br />60 <br />CYD <br />$ 68.00 <br />$4,080.00 <br />Division 2: Upper Walk $1,816,490.00 <br />Division 3: Lower Walk <br />Item <br />No. <br />Description <br />ntit <br />Unit <br />Unit Price <br />Total Amount <br />1, <br />Construction Engineering <br />1 <br />LS <br />$ 6,400.00 <br />$6,400.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />$ 29,000.38 <br />$29,000.38 <br />3. <br />Concrete Sidewalks and Approaches, Remove <br />810 <br />SYD <br />$ 58.00 <br />$46,980.00 <br />4. <br />Light Pole and Foundation, Remove <br />28 <br />EACH <br />$ 830.00 <br />$23,240.00 <br />5. <br />Tree, Remove, over 24" to 36" <br />1 <br />EACH <br />$ 2,800.00 <br />$2,800.00 <br />6„ <br />Tree, Remove, over 36" to 60" <br />2 <br />EACH <br />$ 3,500.00 <br />$7,000.00 <br />7. <br />Common Excavation <br />50 <br />CYD <br />$ 106.00 <br />$5,300.00 <br />8. <br />"B" Borrow <br />50 <br />CYD <br />$ 75.00 <br />$3,750.00 <br />9. <br />Temporary Erosion Control, Silt Fence <br />910 <br />LIFT <br />$ 6.00 <br />$5,460.00 <br />10. <br />Temporary Erosion Control <br />1 <br />LS <br />$ 1.00 <br />$1.00 <br />11. <br />Sidewalk, Concrete, 4" <br />120 <br />SYD <br />$ 63.00 <br />$7,560.00 <br />12. <br />Sidewalk, Stamped Concrete with Integral Color, 5" <br />60 <br />SYD <br />$ 412.00 <br />$24,720.00 <br />13. <br />Landscape Edging, Aluminum, Black <br />80 <br />LIFT <br />$ 7.25 <br />$580.00 <br />14. <br />Tree, Red Maple, 2.5" <br />3 <br />EACH <br />$ 620.00 <br />$1,860.00 <br />15. <br />16. <br />Tree, Commemoration Sugar Maple, 2.5" <br />Tree, American Hornbeam, 2.5" <br />2 <br />2 <br />EACH <br />EACH <br />$ 620.00 <br />$ 682.50 <br />$1,240.00 <br />$1,365.00 <br />Version 1/17/2019 Contractor's Bid for Public Works - 9 <br />