Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Addendum No. 2 <br />Project Name: Riverwalk from Beyer Street to Howard Park <br />Project Number: 117-083A <br />For Bids Due: December 10. 2019 <br />Contractor Name: Rieth-Riley Construction Co., Inc. <br />Division 1: River Wall Repair <br />iP <br />Item <br />No. <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />1. <br />2. <br />Construction Engineering <br />Mobilization/Demobilization <br />1 <br />1 <br />LS <br />LS <br />$ 6,400.00 <br />$ 57,096.00 <br />$6,400.00 <br />$57,096.00 <br />3. <br />Concrete Sidewalks and Approaches, Remove <br />140 <br />SYD <br />$ 67.00 <br />$9,380.00 <br />4. <br />Cofferdams and Dewatering <br />1 <br />LS <br />$ 251,000.00 <br />$251,000.00 <br />5. <br />Sidewalk, Concrete, 4" <br />150 <br />SYD <br />$ 55.00 <br />$8,250.00 <br />6. <br />7. <br />River Wall, Repair, Type A <br />River Wall, Repair, Type B <br />217 <br />226 <br />LFT <br />LFT <br />$ 314.00 <br />$ 456.00 <br />$68,138.00 <br />$103,056.00 <br />8. <br />River Wall, Remove and Replace <br />129 <br />LFT <br />$ 2,000.00 <br />$258,000.00 <br />Division 1: River Wall Repair $761,320.00 <br />Division 2: Upper Walk <br />............... . . <br />Item <br />No. <br />1. <br />Description <br />Construction Engineering <br />Quantity <br />1 <br />Unit <br />LS <br />Unit Price <br />$ 6,400.00 <br />Total Amount <br />$6,400.00 <br />2. <br />Mobilization/Demobilization <br />1 <br />LS <br />$ 107,450.10 <br />$107,450.10 <br />3. <br />CPM Schedule <br />1 <br />LS <br />$ 100.00 <br />$100.00 <br />4. <br />5. <br />6. <br />CPM Monthly Update <br />Maintaining Traffic <br />IClearing Right of Way <br />11 <br />1 <br />1 <br />MO <br />LS <br />LS <br />$ 100.00 <br />$ 2,620.00 <br />$ 37,100.00 <br />$1,100.00 <br />$2,620.00 <br />$37,100.00 <br />7. <br />Concrete Sidewalks and Approaches, Remove <br />720 <br />SYD <br />$ 65.00 <br />$46,800.00 <br />8, <br />Concrete Curb, Remove <br />77 <br />LFT <br />$ 61.00 <br />$4,697.00 <br />9. <br />Light Pole and Foundation, Remove <br />16 <br />EACH <br />$ 730.00 <br />$11,680.00 <br />10. <br />11. <br />Sign, Remove <br />Tree, Remove, 4" to 8" <br />1 <br />1 <br />EACH <br />EACH <br />$ 600.00 <br />$ 850.00 <br />$600.00 <br />$850.00 <br />Version 1/17/2019 Contractor's Bid for Public Works - 7 <br />