Laserfiche WebLink
Addendum No. 2 <br />Riverwalk from Beyer Street to Howard Park <br />Project No. 117-083A <br />OWNER: City of South Bend <br />ENGINEER: Abonmarche Consultants, Inc. <br />Chad A. Knip, P.E. <br />PROJECT: Riverwalk from Beyer Street to Howard Park <br />Project No. 117-083A <br />SUBJECT: Clarifications and Additions to Contract Bidding Documents <br />TO: Plan Holders of Record <br />ISSUE DATE: December 6, 2019 <br />This Addendum No. 2 to the Plans and Specifications and Bidding shall supplement, amend, and <br />become part of these documents. All bids and construction contracts shall incorporate the items <br />addressed in this Addendum. <br />q <br />Contractor's Bid for Public Works, Bid/Proposal <br />Sheets 7 through 11 of the Bid/Proposal issued with this addendum are to be used in the <br />submission of the bid <br />Sheets 7 through 11: <br />• Change quantity of Item B.43, Fence from 1n� to 6 LFT <br />• Change quantity of Item C.35, Ground Cover, Pennsylvania Sedge from4,559 D to <br />"6, 500 Plugs" <br />DRAWINGS: <br />Sheet 25: <br />A. Change Pennsylvania Sedge size and spacing from 4378W #1 P -at 4-2p epee' to 123 <br />50 count flats at 18" spacing <br />Sheet 26: <br />A. Change Legend Note H "Concrete Sidewalk, 5", Fiber Reinforcement, Stamped with <br />Integral Color, CHROMIX P by Scofield, Color: French Gray, or approved equal". <br />Sheet 2 of 8 <br />