My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - Rieth-Riley Construction Co. Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - Rieth-Riley Construction Co. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:37:38 AM
Creation date
12/12/2019 10:22:58 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
83
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
('ily Project No, 1180 t tl'a <br />M(, r:)rrrRm"'* E iigQ',:'„ rifa V.;°C(� r.:(: '+ 0 fig',,5 v <br />Add the following new Special Provision after SP-49 <br />A. State Specifications: None <br />B. City Construction Standards & Specifications: Section 5 <br />C. Additions: <br />1. This work is intended to address the need to replace portions of the <br />existing 2" watermain or existing water service connections at the site. <br />2. These Pay Items are not guaranteed, but shall be determined for <br />authorization after the water lines are potholed by the Contractor. <br />3. Materials shall comply with City Standard Section 5-2. <br />4. Work shall be planned and performed such that water service interruption <br />to any existing residents shall be no longer than 12 hours in duration for <br />no more than two separate occasions. <br />5. Water service connections shall comply with City Standard Drawing 5-3, <br />including the Curb Stop, Corporation Stop and Shut -Off Box. <br />5. Water main crossings under the proposed culvert shall be encased per City <br />Standard Drawing 5-5. The steel pipe casing shall have an inside diameter <br />no less than one inch larger than the largest outside diameter of the <br />proposed watermain (assumed to be at the joint), and extend a distance no <br />less than 5 feet beyond the Outside of the proposed box culvert. <br />7, The City tapping requirements indicated in City Standard Drawing 5-1 <br />shall be met, with tap fee included in the cost of the sewer tap. <br />8. Payment will be made under: <br />Pay Item Pay Unit <br />Water Main Tap, 2 IN EACH <br />Water Main, 2 IN, Encased LFT <br />Water Main, 2 IN. <br />LFT <br />Water Service Line, 9 IN <br />LFT <br />Curb Stop <br />EACH <br />Corporation Stop <br />EACH <br />5of7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.