My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Privet Lane Culvert Replacement Project Proj No 118-013B - G. E. Marshall, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 10:27:49 AM
Creation date
12/12/2019 10:17:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
117
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
or similar equipment <br />Quick Change Barriers <br />over 16 Cubic Yards <br />(Primary Seat) <br />Winch Trucks - 3 <br />Slurry Trucks <br />Axles or more <br />Sweeper <br />Hydraulic Boom Truck <br />Mechanic <br />GROUP 4: <br />Master Mechanic <br />GROUP 5: <br />Equipment with 7 axles or more and stretch trailers <br />GROUP 6: <br />Articulated Dump <br />Foreman <br />Fork Truck — Straight mast 20,000 # & greater <br />Telescopic boom Fork Truck <br />Lowboy <br />Section 6. <br />(a) Non -Residential Construction Work. <br />Wage rates for hauling stone, stabilized base materials, sand, gravel, aggregate and fill materials to a <br />master stockpile on a jobsite and for hauling materials to or from a yard or storage facility may be a <br />percentage determined by addendum of the appropriate hourly rate of pay. Stockpiles under this section <br />may not be placed adjacent to the work site (road beds, ramps, dikes, site of construction, etc_). This <br />does not include the movement of materials within the job site, materials dumped directly on the road bed <br />or site of construction and spread, nor does it include delivery of hot mix asphalt or concrete paving <br />materials or materials dumped into any type of spreading machine on the job site. <br />(b) Residential Construction Work. <br />Wage rates for delivering aggregate fill material from off of the job site to a job site and for hauling <br />excavated material from a master stockpile on a job site off of the job site shall be at 80% of the <br />appropriate hourly rate of pay. This does not include the movement of materials within the job site, nor <br />does it include delivery of hot mix asphalt or concrete paving materials or materials dumped into any type <br />of spreading machine on the job site. <br />(c) Work Assignment. <br />When performing work at a reduced rate, as provided for in Sections 6(a) and 6(b) above, all such <br />reduced rate work shall only be performed by Teamsters Local No. 142 members in good standing. <br />(d) Offsite Plants and Yards. <br />This entire Section 6 shall not apply to offsite plants and yards. <br />(e) Duration. <br />This entire Section 6 shall remain in effect so long as similar language exists in the NWI Contractors <br />Association agreement with Teamsters Local No. 142 (NWI Agreement) — currently Article 11, Section 7 <br />within the NWI Agreement. Should all similar language be eliminated from the NWI Agreement in a future <br />negotiation, then this Section 6 shall be terminated upon the same effective date of the new NWI <br />Agreement that no longer contains similar language. <br />Section 7. Drivers shall be limited to making three (3) equipment changes per day. However, the <br />following shall not be considered equipment changes: <br />13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.