Change Order No 1 - 315 & 319 W. Jefferson Exterior Renovations, Division B Proj No 119-064 - Ziolkowski Construction, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - 315 & 319 W. Jefferson Exterior Renovations, Division B Proj No 119-064 - Ziolkowski Construction, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:13:52 AM
Creation date
12/12/2019 9:54:41 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
INTER -OFFICE MEMORANDUM <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />TO: Linda M. Martin, Clerk <br />Board of Public Works <br />FROM: Zach Hurst, Project Engineer <br />SUBJECT: Change Order No. 1 - Project No. 119-064, Division B <br />315/319 W. Jefferson Exterior Renovations — Masonry Repair <br />DATE: December 3, 2019 <br />oiiwuwu.�urvrvwwwwwwmmmaw mumowm�uuwuw.wwwwuiwmwmwiwworvwwwrvuwniwwwwuwwwwwvew nn�rowooronrrworarr.mmomiamua <br />On October 11, 2019, Ziolkowski Construction advised Cressy Commercial Real Estate and the <br />City that upon power -washing the exterior brick at the subject property, it became apparent that <br />grinding and tuck -pointing of the brick walls was required to ensure proper rehabilitation and <br />sealing of the masonry and ensure adherence to the project specifications and anticipated <br />service life of the repairs being funded by taxpayer dollars. <br />The dollar amount of the added tuckpointing and grinding ($24,798) is 62.66% greater than the <br />original contract value ($39,574). <br />The extent of deterioration was not noticeable during project design, and was uncovered during <br />construction, resulting in unforeseen conditions. As the conditions were unforeseen, and could <br />not have been discovered before the power -washing of the brick, I am recommending approval <br />of this change order. <br />Please call with your questions (3057). <br />
The URL can be used to link to this page
Your browser does not support the video tag.