My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Award Bid - Pinhook Park Site Improvements Proj No 118-077A - Rieth-Riley Construction Co. Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Award Bids
>
Award Bid - Pinhook Park Site Improvements Proj No 118-077A - Rieth-Riley Construction Co. Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 9:36:32 AM
Creation date
12/12/2019 9:46:42 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
12/10/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Pinhook Park Site Improvements <br />Project Number: 118-077A ......................... <br />........................................ <br />For Bids Due: Tuesday, November 26, 2019 <br />..-._......................................... _ <br />Contractor Name: <br />65 <br />WIND CHIME _.........._........._._...__ <br />1 <br />ALLOW <br />....$.......... <br />1 800.00 <br />$ 1,800.00 <br />66 <br />C <br />RUGGED TRAIL CONNECTOR �....._..__............._... <br />1 .............___- <br />LS <br />$ <br />11. <br />�47500 <br />$ <br />,. <br />1147500 ._....._ <br />67 <br />KAYAK LAUNCH AND DOCK <br />1 <br />LS <br />$ <br />44 718.82 <br />$ <br />44 718.82 <br />68 <br />6" CIP RAMPSLAB330 <br />SFT <br />$ <br />50.45 <br />$ <br />16,648.50 <br />69 <br />PRE -CAST PLANK AND STEEL RAILS <br />540 <br />SFT <br />$ <br />102.36 <br />$ <br />55,274.40 <br />70 <br />CONCRETE ABUTMENT __........ <br />5 <br />CYD <br />$ <br />1,960.93 <br />$ <br />9,804.65 <br />TOTAL <br />BASE BID <br />$1 252 900.00 <br />ALTERNATE 1 - OVERLAY OF EAST PARKING LOT <br />Item <br />No. <br />Descrtion <br />Quantitv <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LS <br />$ <br />635.67 <br />$ <br />635.67 <br />...2 ...... <br />EROSION CONTROL <br />1 <br />LS <br />$ <br />1,431.91 <br />$ <br />1,431.91 <br />3 <br />EXCAVATION COMMON <br />232 <br />CYS <br />$ <br />22.40 <br />$ <br />5,196.80 <br />4 <br />HMA MILLING 11..5"mmmmmm ...... <br />2869 <br />Sys <br />$ <br />3.96 <br />$ <br />11,361.24 <br />5 <br />HMA SURFACE, TYPE B <br />310 <br />......._............. <br />TON <br />$ <br />128.11 <br />�..�................. <br />$ <br />39,714.10 <br />HMA INTERMEDIATE, TYPE B <br />6 <br />(WEDGE & LEVEL) <br />97 <br />TON <br />$ <br />104.50 <br />$ <br />10,136.50 <br />7 <br />COMPACTED AGGREGATE, NO. 53 BASE <br />146 <br />CYS <br />$ <br />60.50 <br />$ <br />8,833.00 <br />8 <br />SUBGRADEwTREATMENT TYPE III <br />876 <br />SYS <br />$ <br />4.33 <br />$ <br />3,793.08 <br />9 <br />ADJUST CASTING TO GRADE <br />5 <br />EACH <br />$ <br />638.01 <br />$ <br />3,190.05 <br />. <br />SIGN, <br />, SHEET, ACCESSIBLE PARKING <br />4 <br />EACH <br />$ <br />320.00 <br />$ <br />1,280.00 <br />PAVEMENT MARKING, ACCESSIBLE <br />11 <br />SYMBOL ........ w mmww <br />4 <br />EACH <br />$ <br />35.00 <br />$ <br />140.00 <br />__Uj <br />PAVEMENT MARKING, PAINT, 4 IN <br />1713 <br />.. ..................a <br />LFT <br />$ <br />0.65 <br />..............._.. <br />$ <br />1,113.45 .............. <br />PAVEMENT MARKING, PAINT, ANGLED <br />13 <br />STRIPE <br />268 <br />........ <br />SYS <br />$ <br />0.65 <br />$ <br />174.20 <br />ALTERNATE <br />#1 TOTAL <br />$87,000.00 <br />Version 4/2/2019 Contractor's Bid for Public Works -10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.