Laserfiche WebLink
BID/PROPOSAL oxI � <br />CITY OF SOUTH BEND <br />Project Name: Pinhook Park Site Improvements <br />Project Number: _ 118-077A ...................... <br />.... ........�. __ ..............._ <br />For Bids Due: Tuesday, November 26, 2019 <br />.._......... ......._................... ......_._...._ <br />Contractor Name: <br />BASE <br />BID <br />.-.....__...... <br />Item <br />No. <br />Description <br />Quantity. / <br />Unit <br />Unit Price <br />Total Amount <br />1 <br />MOBILIZATION AND DEMOBILIZATION ........... <br />.......__ 1 <br />LS <br />$ 67,262.33 <br />.�......._ <br />$ 67,262.33 <br />. .._.�_.u. <br />2 <br />MATERIAL TESTING <br />1 <br />LS <br />$ 5,832.09 <br />$ 5,832.09 <br />3 <br />EROSION CONTROL <br />1 <br />LS <br />$ 28,169.33 <br />$ 28,169.33 <br />4 <br />TREE, REMOVE <br />3 <br />EACH <br />$ 833.34 <br />$ 2,500.02 <br />5 <br />TREE PROTECTION <br />1 <br />LS <br />$ 20,593.75 <br />$ 20,593.75 <br />6 <br />CONCRETE SIDEWALK, REMOVE <br />._........................... <br />950 <br />. SYS <br />$ 2.10 <br />...........--...._ <br />$ 1,995.00 <br />7 <br />PLAYGROUND EQUIPMENT, REMOVE <br />1 <br />LS <br />$ 8,097.42 <br />$ 8,097.42 <br />8 <br />EXCAVATION, COMMON <br />1500 <br />CYS <br />$ 22.40 <br />$ 33,600.00 <br />9 <br />EXCAVATION, UNSUITABLE SOILS <br />684 <br />CYS <br />$ 30.95 <br />$ 21,169.80 <br />10 <br />BORROW <br />508 <br />CYS <br />$ 58.12 <br />$ 29,524.96 <br />11 <br />COMPACTED AGGREGATE, mNO. m-53 BASE <br />1246 <br />CYS <br />$ 60.50 <br />$ 75,383.00 <br />COMPACTED AGGREGATE, NO. 53 FOR <br />12 <br />................. <br />UNSUITABLE SOILS <br />_................................ <br />246 <br />..�...._ ........................... <br />CYS <br />$ 73.35 <br />_. <br />$ 18,044.10 <br />COMPACTED AGGREGATE NO. 2 FOR <br />13 <br />UNSUITABLE SOILS <br />439 <br />CYS <br />$ 85.15 <br />$ 37,380.85 <br />14 <br />HMA INTERMEDIATE, TYPE B <br />714 <br />TON <br />$ 104.50 <br />$ 74,613.00 <br />15 <br />HMA SURFACE, TYPE B <br />425 <br />TON <br />$ 128.11 <br />$ 54,446.75 <br />16 <br />SUBGRADE TREATMENT TYPE III <br />2902 <br />SYS <br />$ 4.33 <br />$ 12,565.66 <br />17 <br />SUBGRADE TREATMENT TYPE IV <br />4459 <br />SYS <br />$ 28.51 <br />$ 127,126.09 <br />18 <br />GEOTEXTILE <br />2945 <br />SYS <br />$ 1.60 <br />$ 4,712.00 <br />19 <br />GEOGRID <br />1472 <br />SYS <br />$ 1.60 <br />$ 2,355.20 <br />20 <br />SIDEWALK, CONCRETE 4IN <br />335 <br />SYS <br />$ 58.23 <br />$ 19,507.05 <br />Version 4/2/2019 Contractor's Bid for Public Works - 7 <br />