7. <br />ESS REPORTS (Cont' <br />A -10: <br />Mr. Lennon said basically we are moving along and A -10 PROJECT <br />setting April 1, in- house, to have potential ground- <br />breaking at fire station if all goes well`. Staff <br />is going over the final review, and bids should be <br />in approximately two weeks. <br />The final relocation claim was approved by the Com- <br />mission this morning. We have no problems on the <br />Southeast side. <br />c. Staff Reports: <br />a. Acquisition Status, A -10: This written report was ACQUISITION, A -10 <br />submitted by Mr. William J. Parrish, Real Estate <br />Officer. <br />MN #1: Left to Acquire <br />Parcels to be purchased 35 <br />Purchased 25 <br />Options signed 2 <br />Condemnation 4 <br />City owned 1 32 3 <br />SE #1: <br />Parcels to be purchase 70 <br />Purchased 25 <br />Options signed 12 <br />Condemnation 2 <br />City owned 20 59 11 <br />TOTAL LEFT TO ACQUIRE ..................14 <br />b. Downtown Rehabilitation, R -66: Mr. Edwin R. Bauer, DOWNTOWN RENABILI- <br />Assistant Director, Planning Division, submitted a TION, R -66 <br />written report for construction activity by the <br />private sector in the Central Business District: <br />A. Plaza Place, a joint venture by the St. Joseph - <br />Brown Building Company, erected all structural <br />steel framing, including roof and elevator tower. <br />The steel erection crew is currently installing <br />facade steel for fastening the "exterior skin." <br />The lower level tunnel has been poured and water <br />proofed. <br />B. Plaza East, being constructed by St. Joseph De- <br />velopment Co., has completed the first floor columns <br />and piers and are installing forms for second floor <br />- 14 <br />