Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />PROJECT NAME: Two -Way Conversion of Colfax Ave Phase II <br />PROJECT NO. 115-053B <br />FOR BIDS DUE: November 26, 2019 <br />CONTRACTOR NAME: Walsh & Kelly, Inc. <br />BASE BID <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />42 <br />PLANTER DRAIN TILE, 4" WITH STONE AND <br />272 <br />LFT <br />7.05 <br />$1,917.60 <br />FABRIC <br />43 <br />EROSION CONTROL BLANKET, ERONET S75 <br />911 <br />SYS <br />2.75 <br />$2,505.25 <br />44 <br />PLANTER SOIL MIX <br />120 <br />CYS <br />55.00 <br />$6,600.00 <br />45 <br />SHREDDED HARDWOOD MULCH <br />18 <br />CYS <br />65.00 <br />$1,170.00 <br />46 <br />ADJUST WATER VALVE TO GRADE <br />1 <br />EA <br />310.00 <br />$310.00 <br />47 <br />PIPE, INDOT TYPE 2,12 IN, <br />82 <br />LFT <br />37.00 <br />$3,034.00 <br />48 <br />STANDARD INLET, 24" I.D. W/ CASTING <br />1 <br />EA <br />2,800.00 <br />$2,800.00 <br />49 <br />CASTING, ADJUST TO GRADE <br />6 <br />EA <br />480.00 <br />$2,880.00 <br />50 <br />MAINTAINING TRAFFIC <br />1 <br />LSUM <br />26,595.30 <br />$26,595.30 <br />51 <br />TEMPORARY PAVEMENT MARKING, <br />5,200 <br />LFT <br />0.91 <br />$4,732.00 <br />REMOVABLE, 4 IN. <br />52 <br />CONSTRUCTION SIGN, A <br />12 <br />EA <br />64.00 <br />$768.00 <br />53 <br />CONSTRUCTION SIGN, B <br />17 <br />EA <br />50.00 <br />$850.00 <br />54 <br />CONSTRUCTION SIGN, C <br />1 <br />EA <br />95.00 <br />$95.00 <br />55 <br />BARRICADE, III-B <br />12 <br />LFT <br />12.00 <br />$144.00 <br />56 <br />SIGN, SHEET, SHEETING TYPE IV, WITH <br />57 <br />SFT <br />16.00 <br />$912.00 <br />LEGEND 0.080 IN. <br />57 <br />SIGN POST, SQUARE, TYPE 2, <br />57 <br />LFT <br />16.00 <br />$912.00 <br />UNREINFORCED ANCHOR BASE <br />58 <br />CONDUIT, PVC, 2 IN. SCHEDULE 80 <br />980 <br />LFT <br />8.00 <br />$7,840.00 <br />59 <br />NO. 8 THWN, COPPER CONDUCTOR <br />1,432 <br />LFT <br />1.10 <br />$1,575.20 <br />60 <br />NO. 10 THWN, COPPER CONDUCTOR <br />464 <br />LFT <br />1.05 <br />$487.20 <br />61 <br />NO. 12 THWN, COPPER CONDUCTOR <br />973 <br />LFT <br />1.00 <br />$973.00 <br />62 <br />LIGHT POLE ASSEMBLY AND LUMINAIRE, <br />9 <br />EA <br />5,987.00 <br />$53,883.00 <br />STERNBERG <br />