My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Two-Way Conversion of Colfax Ave. Phase II Proj No 115-053B - Walsh & Kelly
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Two-Way Conversion of Colfax Ave. Phase II Proj No 115-053B - Walsh & Kelly
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 3:19:14 PM
Creation date
12/2/2019 3:15:54 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
34
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
PROJECT NAME: <br />PROJECT NO. <br />FOR BIDS DUE: <br />CONTRACTOR NAME: <br />BASE BID <br />BID/PROPOSAL <br />CITY OF SOUTH BEND `WAIT, <br />T -Way Conversion of Colfax Ave, Phase II <br />115-053B <br />November 26, 2019 <br />Walsh & Kelly, Inc. <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />No. <br />1 <br />CONSTRUCTION ENGINEERING <br />1 <br />LSUM <br />7,200.00 <br />$7,200.00 <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1 <br />LSUM <br />37,700.00 <br />$37,700.00 <br />3 <br />CLEARING RIGHT OF WAY <br />1 <br />LSUM <br />33,600.00 <br />$33,600.00 <br />4 <br />PAVEMENT, REMOVE <br />300 <br />SYS <br />24.00 <br />$7,200.00 <br />5 <br />CURB, CONCRETE, REMOVE <br />310 <br />LFT <br />13.00 <br />$4,030.00 <br />6 <br />SIDEWALK, CONCRETE, REMOVE <br />160 <br />SYS <br />14.00 <br />$2,240.00 <br />7 <br />BORROW <br />50 <br />CYS <br />54.00 <br />$2,700.00 <br />8 <br />EXCAVATION, COMMON <br />708 <br />CYS <br />64.00 <br />$45,312.00 <br />9 <br />TEMPORARY PERIMETER PROTECTION, <br />1,000 <br />LFT <br />2.75 <br />$2,750.00 <br />SILT FENCE <br />10 <br />TEMPORARY INLET PROTECTION <br />12 <br />EA <br />95.00 <br />$1,140.00 <br />11 <br />NO. 2 STONE <br />26 <br />TON <br />30.00 <br />$780.00 <br />12 <br />TEMPORARY GEOTEXTILE <br />80 <br />SYS <br />7.00 <br />$560.00 <br />13 <br />COMPACTED AGGREGATE, NO.53, BASE <br />163 <br />TON <br />36.00 <br />$5,868.00 <br />14 <br />COMPACTED AGGREGATE, NO. 73, ALLEY <br />22 <br />TON <br />37.00 <br />$814.00 <br />SURFACE <br />15 <br />CONCRETE HEADER, 10 IN. <br />174 <br />LFT <br />23.00 <br />$4,002.00 <br />16 <br />INTEGRAL COLORED CONCRETE, 10 IN. <br />51 <br />SYS <br />167.00 <br />$8,517.00 <br />17 <br />RETROFITTED TIE BARS <br />248 <br />EA <br />14.00 <br />$3,472.00 <br />18 <br />PCCP FOR DRIVEWAYS, 6 IN„ <br />85 <br />SYS <br />69.00 <br />$5,865.00 <br />19 <br />PCCP FOR PATCHING, 10 IN. <br />43 <br />SYS <br />112.00 <br />$4,816.00 <br />20 <br />,::: <br />BRICK REPAIR <br />17 <br />SYS <br />254.00 <br />$4,318.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.