Laserfiche WebLink
BID/PROPOSAL <br />CITY OF SOUTH BEND <br />Project Name: Two -Way Conversion of Colfax Avenue — Phase II <br />Project Number: 115-053B <br />For Bids Due: November 26, 2019 <br />Contractor Name: <br />BASE BID <br />Item <br />Description <br />Quantity <br />Unit <br />Unit Price <br />Total Amount <br />63 <br />LIGHT POLE FOUNDATION <br />8 <br />EA <br />64 <br />NO. 4 COPPER, 1/C <br />2,125 <br />LFT <br />65 <br />MULTIPLE COMPRESSION FITTING, <br />16 <br />EA <br />NON -WATERPROOFED <br />66 <br />CONNECTOR KIT, UNFUSED <br />8 <br />EA <br />,rz„ <br />67 <br />CONNECTOR KIT, FUSED <br />8 <br />EA <br />.". <br />,.., <br />8 <br />MULTIPLE COMPRESSION FITTING, <br />16 <br />EA <br />WATERPROOFED <br />69 <br />INSULATION LINK, WATERPROOFED <br />20 <br />EA' <br />> <br />70 <br />INSULATION LINK, NOW <br />20 <br />EA <br />WATERPROOFED <br />71 <br />HANDHOLE <br />5 <br />EA <br />72 <br />PAVEMENT MESSAGE MARKING, <br />6 <br />EA <br />tz <br />MULTI -COMPONENT, BIKE SYMBOL <br />73 <br />LINE, MULTI -COMPONENT, SOLID, <br />185 <br />LFT <br />WHITE, 4 IN. <br />74 <br />LINE, MULTI -COMPONENT, SOLID, <br />100 <br />LFT <br />YELLOW, 4 IN. <br />, <br />TRANSVERSE MARKING, MULTI- <br />75 <br />COMPONENT, CROSSWALK LINE, 6 <br />355 <br />LFT <br />IN. <br />76 <br />TRASH RECEPTACLE, ASSEMBLY,- <br />5°' <br />/ <br />SURFACE MOUNT INSTALLATION <br />r <br />77 <br />BENCH, ASSEMBLY, SURFACE <br />6 <br />EA <br />®� <br />C <br />�� <br />MOUNT INSTALLATION <br />e <br />Cq,2yBASE BID TOTAL b <br />Version 4/2/2019 Contractor's Bid for Public Works -10 <br />