My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - 2019 Community Crossings Round 2 Proj No 119-065 - Walsh & Kelly
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - 2019 Community Crossings Round 2 Proj No 119-065 - Walsh & Kelly
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 8:09:18 AM
Creation date
12/2/2019 2:56:16 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
62
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Project Name: <br />Project Number: <br />For Bids Due: <br />Contractor Name: <br />BID/PROPOSAL <br />CITY OF SOUTH BEND <br />2019 Community Crossings, Round 2 <br />119-065 <br />November 26 2019 9:30 a.m., Local Time <br />Walsh & Kelly, Inc. <br />DIVISION 4: Olive St (From Lincoln Way West to Elwood Ave) <br />Item <br />Line Item <br />Quantity <br />Unit <br />Unit Price <br />Cost <br />No. <br />1 <br />Maintenance of Traffic <br />1 <br />LS <br />$ 21,200.00 <br />$ 21,200.00 <br />2 <br />Mobilization and Demobilization <br />1 <br />$ 7,250.00 <br />$ 7,250.00 <br />3 <br />Milling p , U to 1.5" <br />6178 <br />Sy <br />$ 2.75 <br />$ 16,989.50 <br />4 <br />HMA Surface, 9.5 mm — Type B <br />510 <br />TONS <br />$ 88.00 <br />$ 44,880.00 <br />5 <br />HMA Wedge and Leveling — Type B <br />25 <br />TONS <br />$ 100.00 <br />$ 2,500.00 <br />6 <br />HMA for Patching <br />9 <br />TONS <br />$ 100.00 <br />$ 900.00 <br />7 <br />Tack Coat <br />2 <br />TONS <br />$ 150.00 <br />$ 300.00 <br />8 <br />Joint Adhesive, Surface <br />J <br />2779 <br />LF <br />$ 0.05 <br />$ 138.95 <br />9 <br />Adjust Manhole to Grade <br />J <br />10 <br />EA <br />$ 200.00 <br />$ 2,000.00 <br />10 <br />JAdjust Water Valve Structure to Grade <br />0 <br />EA <br />$ 50.00 <br />$ - <br />11 <br />Adjust Inlet to Grade <br />14 <br />EA <br />$ 200.00 <br />$ 2,800.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.