My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Fire Station Nos. 3 & 6 Renovations Proj No 118-047 - Gibson-Lewis, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Fire Station Nos. 3 & 6 Renovations Proj No 118-047 - Gibson-Lewis, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 11:16:16 AM
Creation date
12/2/2019 2:36:05 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
rf DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />rrpw9 <br />Project Number: 118-047 Project Name: Fire Station Nos. 3 and 6 Renovations Change Order #: 1 <br />DATE INITIATED: 11-18-19 BPW DATE. 11-26-19 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Various value engineering deducts in order to meet budget requirements. <br />Attachments: (List documents support change — required) <br />Various deducts <br />Amount of ❑ Increase / 8 Decrease: $193, 500.00 <br />Categories (Pick One): <br />Previously approved Change Order(s): $, 0.00 B Scope of Work <br />El Differing Site Conditions, Changed Conditions <br />Current Percent of Change: -� 7.28 <br />❑ Conflicted Specifications and Drawings <br />.................... <br />El Failed Materials <br />New Total Amount: $ 926, 500.00 <br />❑ Error <br />-17 28 El Omission <br />Total Percent of Change: % ❑ Final Quantity Adjustment <br />Funding Secured From: <br />(filled out by PM) <br />RECOMMENDED BY: <br />Dan Jones -� <br />Project Inspector (Print Name) (Signature) (Date) <br />REVIEWED BY: <br />Toy Villa. I. 19 • tq <br />Construction Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Alicia Czarnecki 41 <br />Engineering Project Manager (Print Name) (Signature) (Date) <br />APPROVED BY: <br />Kara Boyles <br />City Engineer (Print Name) (Signature) (Date) <br />
The URL can be used to link to this page
Your browser does not support the video tag.