My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement - Engineering & Design Services for CNG Compressor Upgrade at Wastewater Plant - Greeley and Hansen, LLC.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Agreement - Engineering & Design Services for CNG Compressor Upgrade at Wastewater Plant - Greeley and Hansen, LLC.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:07:30 PM
Creation date
12/2/2019 1:48:42 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/26/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
40
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
4. The portion of the Lump Sum amount billed for Engineer's services will be based upon <br />Engineer's estimate of the percentage of the total services actually completed during the <br />billing period. <br />B. Period of Service: The compensation amount stipulated in Compensation Packet BC-1 is <br />conditioned on a period of service not exceeding 12 months. If such period of service is extended, <br />the compensation amount for Engineer's services shall be appropriately adjusted. <br />Page 2 <br />Exhibit C —Compensation Packet BC-1: Basic Services (other than RPR) — Lump Sum Method of Payment <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National Society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.