Laserfiche WebLink
5 9-t <br />.Frill <br />Board met in regular session at Io A.M. all members present. <br />JX Engineer V's''E�timate' Copt of Imprbv6mefit <br />The estimate of the maximum cost of the improvement of La,,Salle Avenue from <br />Eddy Street to Sunnyside Avenue Grade and Curb as per. plans and specifications <br />and as authorized in Improvement Resolution #3. is $2500-00 <br />Engineers, Est i._mate .of Cost of Improvement #4 <br />The estimate of the maximum cost of improvement of Dale AvenAe from Indiana Avenue <br />to Dayton Street by Grade,Curb and Walk as per. plans and specifications and as <br />authorized in Improvement Resolution #,- 4 is $1250-.00 <br />Engineers Estimated Cost of Improvement #5' <br />The estimate of the maximum cost of improvement of East Broadway from MismiSt. <br />to * the East line of Lot 12 Leers Second Addition,by Lateral Sewer aspet.plans <br />and specifications and as authorized in Improvement, Resolution #19 is $IOOC-*,00 <br />President, <br />