Laserfiche WebLink
7. NEWIBUSINESS (cont'd <br />On motion by Mr. Wiggins, seconded by Mr. Chenney, <br />advertising for Contract 2A was approved and unani- <br />mously carried. <br />c. Demolition Contract No. 15, Demolition of. ADVERTISING APPROVED <br />Street Surfaces in Phase I Construction, R -66: Author!- FOR DEMOLITION CON: <br />nation was requested to advertise for Demolition Contract TRACT No. 15,11-66 <br />No. 15 or the demolition of street and alley surfaces in <br />Phase I construction, north of the new post office area. <br />Mr. Ash nfelter advised this is a blanket contract to be <br />phased as buildings are removed. New streets will be <br />built as soon as possible by the contractor awarded <br />Contract No. 1 for Phase I Construction of Streets, <br />Sewers, Sidewalks, Curbs and Appurtenances, R -66. Demoli- <br />tion Co tract No. 15 will be a 180 -day contract. <br />On motion by Mr. Wiggins, seconded by Mr. Chenney, adver- <br />tising was approved for Demolition Contract No. 15. Mo- <br />tion was unanimously carried. <br />d. South Bend Community School Corporation Contract; SOUTH SEND COMMUNITY <br />The South Bend Community School Corporation i.s. presently SCHOOL CORPORATION <br />acquiri g real property upon which to construct the CONTRACT APPR0l1ED, <br />Kennedy Elementary School within the Model Neighborhood MODEL NEIGHBORHOOD <br />area. <br />This Co tract is by and between the South Bend Community <br />School orporation and the Department of Redevelopment <br />acting as the Central Relocation Bureau of the City of <br />South B nd, which has been approved by our Commission <br />Legal C unsel, and is for professional and technical ad- <br />vice and assistance in connection with the relocation of <br />nine (9) families displaced by the acquisition of this <br />property. <br />This De )artment will be fully reimbursed for all costs, <br />plus all actual costs of relocation. <br />Mr. Wiggins suggested the staff do some type of cost <br />analysis on this to be fully compensated. <br />On motion by Rev. Williams, seconded by Mr. Chenney, <br />the above Contract with the South Bend Community School <br />Corporation was approved and the President and-Secretary- <br />authorized to execute. Motion was unanimously carried. <br />e. <br />ing Des <br />into a <br />neering <br />the Cod <br />Chas. W. Cole & Son, <br />Inc. <br />Contract for Engineer- <br />-CHAS. W, COLE & <br />gn of Site Improvements: <br />Authorization to enter <br />SON, INC. CONTRACT <br />ontract with Chas. W. <br />Cole <br />& Son, Inc. for engi - <br />APPROVED; CODE <br />design and inspection <br />of site <br />improvements, in <br />ENFORCEMENT PROJECT <br />Enforcement Project, <br />Ind. <br />E -3, in the Northeast <br />E -3 <br />