City of South Bend - Tech Resource Center <br />Board of Public Works Project No.118-90 <br />Task Name <br />Duration <br />Start <br />� V ,r � , , �l f�����`����✓!��or�°�� � r �o � �� /,� ' � �iif � � 3d <br />05/02/19 <br />Storefront Removal/TemporaryOpenning <br />1d <br />05/09/19 <br />Raise/Fill 2" sub -grade <br />5d <br />05/09/19 <br />Underground Plumbing/Electrical <br />12d <br />05/15/19 <br />Fine Grade Prep for Vapor Barrier/Slab <br />3d <br />05/31/19 <br />Complete Installation of Vapor Barrier <br />5d <br />06/07/19 <br />Installation of Floor Boxes on Top of Vapor Barrier <br />10d <br />06/17/19 <br />Pump/Place/Finish Floor Slab/Saw Cutting <br />2d <br />07/01/19 <br />Wail Framing <br />15d <br />07/03/19 <br />Mechanical/Electrical/Fire Protection at Open Ceiling Area <br />10d <br />07/05/19 <br />Electrical/Mechanical Rough -IN Walls <br />10d <br />07/08/19 <br />Sound Batts at Walls <br />2d <br />07/23/19 <br />Door Frame Installation <br />2d <br />07/18/19 <br />Aluminum Storefront Frames and Measure for Glass <br />10d <br />07/18/19 <br />Sheetrock - Hang/Finish <br />15d <br />07/24/19 <br />Prime & 1 st Coat of Paint on Sheet Rock <br />3d <br />08/14/19 <br />Paint Joist & Decking <br />3d <br />08/19/19 <br />Acoustical Grid <br />2d <br />08/19/19 <br />Fire Extinguisher Cabinets/Extinguishers <br />1d <br />08/19/19 <br />Sound Blades Installation <br />4d <br />08/20/19 <br />Mechanical/Electrical/Fire Protection in Ceiling Grid <br />7d <br />08/21/19 <br />Open Ceiling HVAC/Electricl fixtures Installation <br />7d <br />08/21/19 <br />Corner Gaurds Installation <br />ld <br />08/21/19 <br />Caulking <br />5d <br />08/21/19 <br />Glass Fabrication and Installation of Glass in Aluminum Frames <br />ld <br />08/26/19 <br />Casework Installation <br />5d <br />08/26/19 <br />Plumbing Fixtures <br />ld <br />08/28/19 <br />Bathroom Partitions <br />2d <br />08/30/19 <br />Acoustical Tile Installation <br />ld <br />08/30/19 <br />Capet Installation <br />3d <br />09/02/19 <br />Vinyl Transistion at Column Base <br />1d <br />09/05/19 <br />Wood Doors & Hardware Installation <br />1d <br />09/05/19 <br />Final Painting <br />5d <br />09/06/19 <br />Vinyl Cove Base Installation <br />2d <br />09/11/19 <br />Accessories <br />2d <br />09/16/19 <br />Punch List <br />3d <br />09/17/19 <br />Final Cleanning <br />2d <br />09/19/19 <br />ld <br />09/23/19 <br />