BID/PROPOSAL
<br />CITY OF SOUTH BEND
<br />so ST �
<br />Project Name: Ewing Avenue and Fellows Street Traffic Signal '' a
<br />Project Number: 118-097
<br />For Bids Due: September 10, 2019
<br />yes
<br />Contractor Name: Pemberton Davis Electric Inc.
<br />BASE BID
<br />Item
<br />No.
<br />Description
<br />Quanti
<br />Unit
<br />Unit Price
<br />Total Amount-
<br />1 .
<br />Construction Engineering
<br />1
<br />LS
<br />1,000.00
<br />1,000.00
<br />2.
<br />Mobilization/Demobilization
<br />1
<br />LS
<br />8,500.00
<br />8,500.00
<br />3„
<br />Clearing Right of Way
<br />1
<br />LS
<br />150.00
<br />150.00
<br />4.
<br />'Concrete Curb, Remove
<br />245
<br />LFT
<br />16.50
<br />4,042.50
<br />5.
<br />Concrete Sidewalk, Remove
<br />150
<br />SYD
<br />25.00
<br />3,750.00
<br />6.
<br />Signal Pole and Foundation, Remove
<br />4
<br />EACH
<br />720.00
<br />2,880.00
<br />7,
<br />Handhole, Remove
<br />1
<br />EACH
<br />250.00
<br />250.00
<br />8..-
<br />Traffic Signal- EGui ment;-Remove-anc-Salvage . --
<br />'LS-
<br />�,500.0�
<br />........ 1,500.00--
<br />'l
<br />9.
<br />Common Excavation
<br />1
<br />LS
<br />12,000.00
<br />12,000.00
<br />10.
<br />Temporary Erosion and Sediment Control
<br />1
<br />LS
<br />500.00
<br />500.00
<br />11 �
<br />Compacted Aggregate for Base, No. 53
<br />35
<br />TON
<br />110.00
<br />3,850.00
<br />12.
<br />HMA Surface, 9.5 mm, Type B
<br />7
<br />TON
<br />720.00
<br />5,040.00
<br />13.
<br />HMA Base, 25.0 mm, Type B
<br />35
<br />TON
<br />160.00
<br />5,600.00
<br />14.
<br />Concrete Curb
<br />220
<br />LFT
<br />60.00
<br />13,200.00
<br />15.
<br />Concrete Sidewalk, 4"
<br />65
<br />SYD
<br />140.00
<br />9,100.00
<br />16,
<br />Concrete Curb Ramp
<br />55
<br />SYD
<br />140.00
<br />7,700.00
<br />17.
<br />Detectable Warning Surface
<br />14
<br />SYD
<br />125.00
<br />1,750.00
<br />18.
<br />Sodding
<br />190
<br />SYD
<br />15.00
<br />2,850.00
<br />19.
<br />Service Point, TESCO Cabinet
<br />di
<br />EACH
<br />8,000.00
<br />8,000.00
<br />20.-
<br />TS-2 Controller Cabinet and P1 Foundation
<br />1
<br />EACH
<br />21,000.00
<br />21,000.00
<br />21.
<br />Thermal Detection System
<br />1
<br />EACH
<br />3,200.00
<br />3,200.00
<br />22.
<br />Thermal Detection Camera
<br />2
<br />EACH
<br />9,200.00
<br />18,400.00
<br />23,
<br />Signal Cantilever, Foundation
<br />4
<br />EACH
<br />1,850.00
<br />7,400.00
<br />24.
<br />Pedestrian Push Button Pole and Foundation
<br />5
<br />EACH
<br />550.00
<br />2,750.00
<br />25,
<br />Traffic Signal Head, 3 Section, 12" Red, Amber,
<br />8
<br />EACH
<br />820.00
<br />6,560.00
<br />Green
<br />Version 1/17/2019 Contractors Bid For Public Works-7
<br />
|