My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Ewing Ave & Fellows St Intersection Traffic Signal Proj No 118-097 - Martell Electric
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Ewing Ave & Fellows St Intersection Traffic Signal Proj No 118-097 - Martell Electric
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:19:40 AM
Creation date
11/14/2019 10:40:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
26
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
MARTELL <br />dry;sa'aMcd'uF:r.'M'II'NiFiA'."fi"Yt'pfiYNp A1�k'Y4ir <br />Section II: Plan & Equipment Questionnaire: <br />1. Explanation plan/layout for performing proposed work: <br />Martell Electric, LLC intends to utilize our pre -construction services department and pre- <br />fabrication division in the proposed schedule and execute accordingly. <br />2. Subcontractors that have been used; <br />a. Core Bore, 110 Ullery Rd, Niles, MI 49120 — Directional Boring <br />b. Schenk Lightning Rod, Inc, 53140 Poppy Rd, South Bend, IN 46628 — Lightning <br />Protection <br />c. Premium Concrete, 712 Richmond St, Elkhart, IN 46516 — Concrete <br />d. Traffic Control Specialists, 1810 W Pacific Ave, Knox, IN 46534 — MOT <br />3. Intended sublet work: <br />A listing of intended subcontractors will be provided prior to contract approval. <br />4. Equipment available for use: <br />Martell Electric, LLC owns, maintains, and operates all necessary tools and equipment. This <br />includes but is not limited to, Bucket Trucks, Scissor Lifts, Scaffold, Mini Excavator, <br />Trenchers and Line Trucks. Anything not owned, will be rented. <br />5. Contracts or offers for all materials: <br />Martell Electric, LLC has received quotations for material, but we have not entered into any <br />contracts related to this project. <br />Section III: Contractor's Financial Statement: Enclosed <br />2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.