My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - East Bank Trail Storm Repairs Proj No 118-306 - Rieth-Riley Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - East Bank Trail Storm Repairs Proj No 118-306 - Rieth-Riley Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:17:30 AM
Creation date
11/14/2019 10:37:31 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
65
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL" <br />CITY OF SOUTH BENDyxu°rrua <br />Project Name: EAST BANK TRAIL STORM REPAIRS' <br />1 <br />Project Number: 118-306 <br />For Bids Due: November 12, 2019 <br />x� ` <br />Contractor Name: Rieth Riley Construction Co., Inc <br />BASE BID <br />Item <br />No. <br />..... _ _ <br />Description <br />_M.. <br />quantity ..... <br />Unit ...... <br />.... <br />Unit Price <br />......... <br />Total Amount <br />1 <br />Mobilization and Demobilization <br />1 <br />.. .... <br />LS <br />_ $11,500.00 <br />$11,500.00 <br />2 <br />Construction Engineering <br />1 <br />..M . _ _ <br />LS <br />$9,200.00 <br />.. <br />_...�....... <br />$9,200.00 <br />3 <br />Material Approval and Testing <br />......... <br />1 <br />LS <br />$500.00 <br />$500.00 <br />4 <br />Temporary Erosion Control <br />1 <br />LS <br />_... _. _ <br />$8,549.19 <br />_._..... <br />$8,549.19 <br />5 <br />Maintenance of Traffic <br />1 <br />LS <br />$15,000.00 <br />$15,000.00 <br />6 <br />Clearing of Right of Way <br />_.. <br />1 <br />........ <br />LS <br />$19,789.75 <br />$19,789.75 <br />7 <br />Excavation, Common <br />252 <br />CY <br />$114 97 <br />$28,972.44 <br />8 <br />B Borrow <br />150 <br />CY <br />$76.14 <br />$11,421.00 <br />9 <br />Subgrade Treatment, Type III <br />�........... <br />1200 <br />...... <br />SY <br />...._... <br />$9.32 <br />$11,184.00 <br />10 <br />Compacted Aggregate, No. 53 Base <br />126 <br />CY <br />$131.86 <br />$16,614.36 <br />11 <br />Compacted Aggregate, No. 53 <br />110 <br />Ton <br />$124.24 <br />$13,666.40 <br />12 <br />HMA Intermediate, Type B <br />135 <br />Ton <br />$196.94 <br />$26,586.90 <br />13 <br />HMA Surface, Type B <br />�_ <br />85 <br />Ton <br />$239- <br />4.05 <br />14 <br />PCCP, 4 in, Header <br />... ._....... <br />20 <br />SY <br />$331.86 <br />...... <br />$6,637.20 <br />15 <br />Timber Railing <br />175 <br />LFT <br />$100.00 <br />$17,500.00 <br />17 <br />Mulched Seeding, U <br />—_............. . ........ <br />81 <br />—.- _.a <br />SY <br />$15.75 <br />_..._ <br />$1,275.75 <br />18 <br />. <br />Sodding, Nursery <br />_ ................ <br />203 <br />_ <br />SY <br />$29.67 <br />_...._ <br />_.._ <br />$6,023.01 <br />19 <br />...._. <br />Water for Sodding <br />_� _ ......... _ <br />12 <br />......... <br />kGal <br />$1.00 <br />$12.00 <br />20 <br />Permanent Turf Reinforcement Mat <br />81 <br />� <br />SY <br />$23.95 <br />. <br />_.. <br />$1,939.95 <br />21 <br />Road Closure Si n Assembly <br />9 Y <br />__.... <br />_ 3 <br />EA <br />$225.00 <br />$675.00 <br />22 <br />Detour Route Marker Assembly <br />7 <br />EA <br />_M ...... <br />$89.00 <br />__..... _, <br />$623.00 <br />23 <br />Construction Sign, A <br />4 <br />EA <br />$94.00 <br />$376.00 <br />_24 <br />Barricade, Type III -A <br />120 <br />LFT <br />$13.00 <br />$1,560.00 <br />Version 4/2/2019 Contractor's Bid for Public Works - 7 <br />
The URL can be used to link to this page
Your browser does not support the video tag.