My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - 510 S. Main St. Building Improvements Proj No 119-084 - HC3 LLC dba St. Clair Development
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 2 - 510 S. Main St. Building Improvements Proj No 119-084 - HC3 LLC dba St. Clair Development
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:52:27 PM
Creation date
11/14/2019 10:27:53 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Change Order #2 Price Breakdown <br />• Restroom Accoutrements $1,501.00 <br />- Added paper towel dispenser (omitted) <br />• Locking Thermostat Covers: $194.00 <br />- In order to lock controls <br />• Fence Tarp Deduct: ( ) <br />- In lieu of slats (same screening purpose) <br />• Remove Old Signage $1,120.00 <br />- Remove all 'Salvation Army' signage <br />• Paint Facade $1,400.00 <br />- Add aesthetic appeal <br />• Replace Extra Ceiling Tile $854.00 <br />- Excess the replacement needed <br />• Add Water Heater $1,106.00 <br />- No hot water feed from adj. building as thought <br />• 'Keep Off' Signage $100.00 <br />- Added to eliminate potential liability issues <br />• Furnace Repair $546.00 <br />- Secondary furnace repaired for use as a backup <br />• Front Door Tint $292.50 <br />- Added for privacy reasons <br />• Replace Stolen Downspouts $439.00 <br />- Original downspouts stolen and needed replaced <br />
The URL can be used to link to this page
Your browser does not support the video tag.