My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Amendment to PSA - Engineering Design Services for St. Joseph Riverbank Stabilization - Cardno, Inc.
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Amendment to PSA - Engineering Design Services for St. Joseph Riverbank Stabilization - Cardno, Inc.
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:24:31 PM
Creation date
11/14/2019 10:18:27 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
This is EXHIBIT K, consisting of 9 pages, referred to in <br />and part of the Agreement between Owner and Engineer <br />for Professional Services dated November, 12, 2018. <br />AMENDMENT TO OWNER -ENGINEER AGREEMENT <br />Amendment No. 1 <br />1. Background Data. - <br />November 12, 2019 <br />a. Effective Date of Owner -Engineer Agreement: <br />b. Owner: Board of Public Works, City of South Bend, Indiana <br />Engineer: Cardno, Inc <br />d. Project: St. Joseph River Bank Stabilization LARE Feasibility: Riverside Drive at <br />Yukon <br />2. Description of Modifications:• <br />a. Engineer shall perform or furnish the following Additional Services: <br />1) Design Submittals including: 30% drawings and cost estimates; 60% drawings, cost <br />estimates and draft specifications; 90% drawings, cost estimates, full specs, and any <br />permits. <br />2) Design costs include 3 separate bid packages for the separate project locations and <br />geotech for 2 bank stabilization locations. <br />3) Cardno to assist City in preparing and submitting LARE Construction application <br />prior to January deadline. <br />4) Cardno will perform 2 geotech soil borings to characterize soil conditions. <br />See Attachment 1 <br />b. For the Additional Services or the modifications to services set forth above, Owner <br />shall pay Engineer the following additional or modified compensation: <br />See Attachment 1 <br />c. The schedule for rendering services is modified as follows: <br />See Attachment 1 <br />5. Agreement Summary (Reference only) <br />Page 1 <br />(Exhibit K — (Amendment to Owner -Engineer Agreement) — Attachment 1) <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services. <br />Copyright © 2008 National society of Professional Engineers for EJCDC. All rights reserved. <br />
The URL can be used to link to this page
Your browser does not support the video tag.