Laserfiche WebLink
Project Fee Proposal <br />111 flasks listed wilill be billled under C irdnc Iproject A BX465600, p1hase 22 Design. <br />1. Identification of project boundaries (included in report phase): <br />$0.00 <br />2. Complete preliminary engineering/calculations $25,200.00 <br />($18,000 in pass through contracts for survey and soil borings + 60 hrs. at $120.00/ <br />hr.") <br />$8,000.00 <br />3. Obtain project permits <br />($800.00 in expenses including DNR permit fees, 60 hrs. at $120.00/hr.) <br />$4,800.00 <br />4. Facilitate meetings regarding the proposed project: <br />($620.00 in expenses + 40 hrs. at $120.00/hr.) <br />$1,200.00 <br />5. Monthly progress reports <br />(10 hrs. at $120.00/hr.) <br />$7,800.00 <br />6. Complete conceptual drawings <br />(65 hrs. at $120.00/hr.) <br />$1,200.00 <br />7. Construction cost estimates and timelines <br />(10 hrs. at $120.00/hr.) <br />$1,200.00 <br />8. Confirm easements and land ownership <br />(10 hrs. at $120.00/hr.) <br />$4,800.00 <br />9. Complete Flood Stage Analysis <br />(40 hrs. at $120.00/hr.) <br />$600.00 <br />10. Model functionality of proposed project using EPA Region 5 Model <br />(5 hrs. at $120.00/hr.) <br />$0.00 <br />11. Conduct a wetland functional assessment or vegetation survey <br />(Task completed in feasibility study) <br />800.00 <br />12. Complete engineering feasibility report: <br />($100.00 in copy expenses, 40 hrs. at $120.00/hr.) <br />Total Project Fee $59,600.00 <br />*Cardno standard hourly rates range from $65 to $165/hr. for staff assigned to project, $120.00/hr. is an average <br />E l f � � ,i lAi III i�u � � � iia�� � �i, <br />��I III IIIIII I� $� ��� �r�� r .� �* ������ � ���� - �, � a � � � ����,� .�� � ���� �� � . w r <br />� � uuuVuVUUDuuVuu�uVuu i � s � immmi � $°i UIUIIIIUOfIU Iu s a * � " <br />