My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Agreement - Local Roads & Bridges Matching Grant - 2019 Community Crossings Round 2 - INDOT
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
Agreement - Local Roads & Bridges Matching Grant - 2019 Community Crossings Round 2 - INDOT
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 1:08:32 PM
Creation date
11/14/2019 10:00:04 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
11/12/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
ATTACHMENT A <br />PROJECT DESCRIPTION <br />Des. No.: 1902365 <br />Program: Local Roads and Bridges Matching Grant <br />Type of Project: LIMA OverIaL Preventive Maintenance <br />Location: <br />_.Road <br />. ....., Se ment <br />From <br />Award <br />IRONWOOD DR <br />_.. <br />Ireland Rd <br />250 FT S of US 20 <br />......................._. <br />$126,080.80 <br />AMERITECH DR <br />ClevelandRd <br />675 FT N of <br />$54,855.69 <br />Carbonmill <br />MIAMI ST <br />Ireland Rd <br />Widener Ln <br />$112,233.78 <br />OLIVE ST <br />Lincoln Way West <br />Elwood Ave <br />$74,463.88 <br />Application ID: 7055 <br />A general scope/description of the Project is as follows: <br />Mill and resurface at least 1.5 inches of HMA surface pavement and provide thermoplastic striping and markings for <br />the following roadways within the City of South Bend: Ameritech Drive from Cleveland Road to 675 feet north of <br />Carbonmill, Ironwood Drive from Ireland Road to 250 feet south of U.S. 20, Miami Street from Ireland Road to <br />Widener Lane, and Olive Street from Lincoln Way West to Elwood Avenue. Additional adjusting of various <br />structures to grade will be included in the work. Sidewalk curb ramps that are not in ADA compliance will be <br />removed and replaced. <br />The maximum amount of state funds allocated to the Project is $367,634.15. <br />07/19 <br />
The URL can be used to link to this page
Your browser does not support the video tag.