My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SM 02-11-71
sbend
>
Public
>
Redevelopment Commission
>
Minutes
>
1970-1979
>
1971
>
SM 02-11-71
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/6/2012 10:43:03 AM
Creation date
9/11/2012 2:13:57 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
3. NFW BUSINESS (Cont'd <br />3 ) The architect's sketches do not illustrate the <br />upper stories and are inconsistent with the <br />"working drawings. <br />B cause the materials submitted are inadequate, the <br />c mmittee is severely limited in its ability to <br />k owledgeably review this proposal for the purpose of <br />d termining whether it meets all minimum rehabilitation <br />s andards of the Central Downtown Urban Renewal Area <br />P an. <br />Ir is, however, the opinion of this Committee that the <br />exterior design (particularly as depicted by the eleva- <br />t ons on sheet numbered 5) shows a serious lack of <br />coordination between the upper and lower stories and a <br />lack of architectural harmony between the subject struc- <br />t re after rehabilitation and the adjacent property. <br />T e architectural character thus expressed is unsatis <br />f ctory for this important parcel. <br />For the reasons outlined above, the committee cannot <br />recommend approval of this proposal. The committee <br />itivites the submission of complete working drawings and <br />specifications and offerssto consider them at the owner's <br />earliest convenience. <br />Mr. Hammerschmidt recommended that once a decision is made by the <br />Commission, immediately talk to Dr. Katz and Mr. Gardner. Give <br />them a set of standards, explain what is to be done and expedite <br />presentation. <br />On mot on by Mr. Helmen, seconded by Mr. Chenney, submission of <br />comple a working drawings and specifications are requested for <br />consid ration, and unanimously carried. <br />Mr. Harnerschmidt advised to offer Dr. Katz architectural services <br />for deign discussed in previous Commission meeting and advise him <br />he wit have additional time in his present location, until the end <br />of Apr 1, under Federal rules and regulations. Timing as far as <br />they are concerned is important. <br />4. ADJOURNMENT <br />With the conclusion of the business for which this ADJOURNMENT <br />meetin was called, on motion duly made and passed by Mr. <br />Helmen, the meeting adjourned at 2:40 P.M. <br />(SEAL) <br />elter, xecutive Director Dean . Wilhelm, President <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.