My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2B Regular Meeting Minutes
sbend
>
Public
>
Redevelopment Commission
>
Agendas & Packets
>
2012
>
09-13-12 Packet
>
2B Regular Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/1/2012 9:26:57 AM
Creation date
9/10/2012 1:04:28 PM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
South B <br />Regular <br />Redevelopment Commission <br />eting — August 30, 2012 <br />6. NEW 13USINESS (CONT.) <br />E. Northeast Neighborhood Development Area <br />continued... <br />work that's happening on Eddy Street by <br />Eddy Street Commons. The master plan is a <br />vision of what might happen, but in order to <br />make that reality, staff needs to look at what <br />utilities might need to be relocated. <br />Mr. Varner asked whether the utility <br />relocation would be based on the new street <br />alignment. Mr. Kain replied that there will <br />be some relocation done as part of the SR23 <br />project, but that will only focus on the <br />utilities in or near the street, not those within <br />the parcels. <br />Mr. Inks asked Mr. Kain to make comments <br />on the electrical utilities that staff is already <br />looking at to reroute through the area. Mr. <br />Kain responded that the initial proposal from <br />AEP was to take their high tension electric <br />poles through the intersection along the south <br />side of the streets. Given the vision for <br />commercial development here, there is a <br />desire by local developers and NNRO to <br />relocate the electric poles. Engineering staff <br />has been coordinating this project, which <br />includes moving the poles south from Duey <br />Street down existing alleys to Corby and then <br />west. <br />Mr. Varner asked if the,electric is being done <br />as part of the road realignment. Mr. Kain <br />answered that the electric will be done as part <br />of the realignment. AEP will cover most of <br />the cost, but there is a small gap that Public <br />Works will be covering. There is no cost to <br />the Redevelopment Commission. There is a <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.