My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/26/1908 Board of Public Works Special Meeting Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1908
>
05/26/1908 Board of Public Works Special Meeting Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:21:33 PM
Creation date
10/30/2019 10:31:44 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
5/26/1908
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
TuesdA <br />26thj 1909. <br />The Board met in regular session at 10 A._ M. All members present. <br />Contractor Bonds of Geo. Bennett and John L. t:Tish were filed and approved. <br />Petition filed by C. Edward Bucher for the vacation of a part of the lst alley <br />west of Lafayette street from Jefferson street south. <br />President. <br />SPECIAL SESSION TUESDAY EVENING MAY 26TH,,19082 AT 7:15 <br />The Board net in Special Session at 7:15 P. H. All members present. <br />Remonstrance filed by the Singer Manufacturing Company against the Meade street <br />Trunk Sewer. <br />Hearing on Declaratory Resolutions for Trunk Sewer on Meade street, Huron street <br />and Olive street and Trunk Sewer on Prairie avenue, under Improvement Resolutions Nos. <br />548 & 549 respectively, were deferred until June 12th, 1909, at 10 A. M. <br />t <br />Hearing given on Daclaratory Resolutions for Asphalt Paverrent on West Washington <br />street from Michigan street to the west line of•Walnut street, Grading of St. Peter <br />street from Sorin street to Cedar street, Brick Pavement on the first alley south of <br />Jefferson street from Lafayette street to William street. All under improvement resolutions <br />Nos. 550, 551 & 552 respectively. <br />Engineer filed estimated cost as follows: <br />Washington street Asphalt pavement $56,000.00 <br />St. Peter street Grad#ing 311.00 <br />Alley wouth of Jefferson street Brick 1,500.00 <br />Engineer was instructed to amend the.specifications for the West Washington street <br />Aaphalt pavement and to make same read as follows: A brick (blocK) pavement from <br />a line 12 inches on the outside rail of one street car track to a similar line along <br />the other track. <br />In all of the above matters no remonstrators appeared and no remonstrances were filed. <br />The Board therefore find in each and every case in said improvements that the benefits <br />to the property and to the City of South Bend are equal to the estimated cost of said <br />improvements and the same are -hereby in all things ratified, confirmed and approved. <br />Be it resolved that notices be published 6n the South Bend Daily Times on the 27th <br />dayof May and on the 3rd day of June, 1905, to.the effect that this Board will receive <br />bids for said i<<iprovements up to 10 am on the-16-th day of June, 1905. The Board reserves <br />the right to reject any or all bids. <br />President. <br />
The URL can be used to link to this page
Your browser does not support the video tag.