Laserfiche WebLink
Wednesday 4ay 6th <br />The Board met in regularsession at 10 A. M. All members present. <br />Petition of Ben Koehler et. al. for pipe sewer on east Wayne street from <br />Notre Dame street to st. Peter Street was referred to the Engineer for specifications <br />Contract signed with the Fullerton -Powell Hardwood Lumber Company for <br />30,000 feet of White Oak Lumber for the street Department. Contract price $25.00 M <br />