My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
01/24/1908 Board of Public Works Minutes
sbend
>
Public
>
Public Works
>
Minutes
>
1908
>
01/24/1908 Board of Public Works Minutes
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/16/2024 2:19:01 PM
Creation date
10/29/2019 12:32:46 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Minutes
Document Date
1/24/1908
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
Page 1 of 1
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
The Board met in regular sess-ion at 10 A 1. All members., present. <br />Hearing on Assessment Roll and final estimate for Brick Pavement on Cottage <br />Grove- avenue & --Grand View Avenue, was deferred until-' January 31st, 19092 at 10 A.M. <br />Hearing on Declaratory Resolution No. 509 for Pipe Sewer on Edward street was <br />deferred until February 25th, 1901, at 10 A. M. <br />Hearing on Condemnation Resolution No. 43 for the opening of a thoroughfare along <br />the south side of the C._ I. & S: R.R.-was deferred until January 31,_19092 at LO A.M. <br />Petition filed for the Grading of St Peter street from Cedar street to Sorinstreet. <br />Referred to the Engineer for Specifications. <br />City Attorney was instructed to take the necessary ateps to have the piling removed, <br />which was placed in.the St. Joseph River, south of the LaSalle avenue bridge and on the <br />west side of the river. Also have encroachment in the nature of a fill removed. Said <br />work to be done immediately. <br />President. <br />
The URL can be used to link to this page
Your browser does not support the video tag.