Laserfiche WebLink
4. <br />I <br />b. HUD letter dated--December 19, 1968; approving; GEOMETht;IC DESIGN <br />undertaking eometric design study for thorou fare STUDY, CENTRAL <br />system i in the Central Downtown Project:. HUD. office _90( TOWN_ PROJECT, <br />approve: -a contract for engineering serv3des with Clyde <br />E. Williams & Associates, , Inc. to perform- "a geometric. :> <br />design study for the thoroughfare system. Clyde E. <br />Williams & Associates, Inc. was.Rdesignated by the Com- <br />mission as the engineers for this project in the past <br />and we now have approval for this contract from-HUD,- <br />which cost is not to exceed $5,000; <br />5. NEW BUSINESS <br />V <br />a. Certificate of.-Completion for Raitt- Corpo- <br />RAiTT "CORPORATION, <br />ration in the Sample Street Project R -7: This in- CERTIFICATE.OF <br />volves the last disposition parcel in the Sample Street COMPLETION, SAMPLE <br />Project, Parcel #2, purchased.by the_;,Raitt "corporation ,,STP.EET,PROJECT, R -7 <br />from the Redevelopment Department - arid, - subsequetJ.y,-:, , <br />were. ti a developers for the White Motor Txuekg Sales, <br />&Sere Services, and the National Mill Supply," Trio. Both _ <br />structures are completed and in operation, The premises F <br />have been inspected and found: `satisfactory . Mr. Helmen . ;:. <br />asked if there was a limitation on the sale of this,, <br />parcel and that', if the Whte..Motor Trucks Safes & ,Services <br />wants to buy the building, what are "the requirements? <br />The Co fission Legal Counsel,, Mr. Hammerschmidt,F set <br />id„ <br />there as none and that only the puve a ed price ;of t e 1 <br />land i controlled for resale President W ggi ,s said <br />they c n make a profit on the..building I but- not <br />land, as.-the land must be sold at the price purchased,, <br />On motion by Mr. Kompar, seconded, by Mr." Helmen, the,:,, <br />Commission authorized the, President arid. Secretary to <br />execute the Certificate of. Completion. <br />b. Authorization for the President to .execute_ 1<,CL}E E WILLIAMS <br />Contract with Clyde E. Williams'. `&Associates Inc. to __ &r,�QCIATES, INC. <br />erfor , eometric design stud for the thorou fare } ,�pNTCT:.C:ENTRAL <br />system . in the Central Downtown. Project.. R -66; This,;: _ iNTE3WN ,_PROJECT, <br />involves the geometric design , study as discussed;, ab,Qve <br />under HUD letter dated December 19, 1968. On motion <br />by Mr. Helmen, seconded by Rev. Kirk, authorization <br />_-was given for the President and the Assistant .Secretary t <br />to execute the Clyde E Williams & Associates :Inc cor3 <br />tract. - J - <br />