My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
PSA - DLZ Indiana - Cleveland South Well Field Bulk Flouride Tank Replacement
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Agreements/Contracts/Proposals
>
PSA - DLZ Indiana - Cleveland South Well Field Bulk Flouride Tank Replacement
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2025 2:37:47 PM
Creation date
10/23/2019 12:33:36 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
12
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
design and construction standards which Owner will require to be included in the Drawings and <br />Specifications; and furnish copies of Owner's standard forms, conditions, and related documents <br />for Engineer to include in the Bidding Documents, when applicable. <br />C. Engineer shall complete its services within a reasonable time, or within the following specific time <br />period: 60 days from the Effective Date. <br />D. If the Project includes construction -related professional services, then Engineer's time for <br />completion of services is conditioned on the time for Owner and its contractors to complete <br />construction not exceeding 6 months. If the actual time to complete construction exceeds the <br />number of months indicated, then Engineer's period of service and its total compensation shall be <br />appropriately adjusted. <br />2.01 Payment Procedures <br />A. Invoices: Engineer shall prepare invoices in accordance with its standard invoicing practices and <br />submit the invoices to Owner on a monthly basis. Invoices are due and payable within 30 35 days of <br />receipt. r t Ow,,,,s... �, m . <br />u. <br />, <br />In addition, Engineer may, after giving seven days written notice to Owner, suspend services under <br />this Agreement until Engineer has been paid in full all amounts due for services, expenses, and <br />other related charges. Owner waives any and all non -disputed claims against Engineer for any such <br />suspension. h ,.4.��� fit•1. <br />3.01 Termination <br />A. The obligation to continue performance under this Agreement may be terminated: <br />1. For cause, <br />a. By either party upon 30 days written notice in the event of substantial failure by the <br />other party to perform in accordance with the Agreement's terms through no fault of the <br />terminating party. Failure to pay Engineer for its services is a substantial failure to <br />perform and a basis for termination. <br />b. By Engineer: <br />1) upon seven days written notice if Owner demands that Engineer furnish or perform <br />services contrary to Engineer's responsibilities as a licensed professional; or <br />2) upon seven days written notice if the Engineer's services for the Project are delayed <br />for more than 90 days for reasons beyond Engineer's control. <br />Engineer shall have no liability to Owner on account of a termination by Engineer under <br />Paragraph 3.0I.A.l .b. <br />c. Notwithstanding the foregoing, this Agreement will not terminate as a result of a <br />substantial failure under Paragraph 3.01.A.1.a if the party receiving such notice begins, <br />Page 2 ........ <br />EJCDC E-500 Agreement Between Owner and Engineer for Professional Services <br />2008 National Society of Professional Engineers for VJCDr, All rights reserved <br />Copyright L .__.... _......._ .............._........................................... <br />
The URL can be used to link to this page
Your browser does not support the video tag.