My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Spec V - Two More or Less 2019 or Newer Tandem Axle Stainless Steel Multi Use Dump Truck - Truck Centers Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Spec V - Two More or Less 2019 or Newer Tandem Axle Stainless Steel Multi Use Dump Truck - Truck Centers Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 11:18:46 AM
Creation date
10/23/2019 12:20:13 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
53
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
III' III �mµIII SHALL BE <br />AS <br />TYPE DESCRIPTION SPECIFIED <br />(Circle One) <br />Hitch shall be tapered on the truck side as to allow better clearance <br />for chassis hood clearance. There shall also be a rubber stop <br />installed on truck side of the hitch as to prevent the chassis hood <br />from contacting the plow hitch. <br />Husting hitch shall be provided with a set of tapered rollers in lieu <br />of the standard cams. <br />Mounting Truck frame will be extended forward of grill. Bidder will furnish (YpSi'O <br />Material: minimum 2"x 4" x 8" x 48" long angle across front bumper. <br />Bottom braces shall be installed from hitch to frame with 3 3/4 bolts, <br />grade 8. Material 1" x 4" flat iron minimum. Top braces 2"x 4" <br />flat iron minimum and run to frame. Hose to hook up hitch and <br />cylinder shall be 3/8" and furnished by bidder. Hooked to <br />hydraulics part, with 1,000 lbs. PSI port relief minimum. Bumper <br />angle is to be mounted to frame with four (4) pieces of 4" x 8" <br />minimum angle to frame. Hood to have cable stop before resting <br />on plow hitch. Plow lights to be included. <br />"�a'W"i' <br />Alternate #1: Front Snow Plow �1:STO <br />Plow shall be equal to Monroe MP-4IR-ISCT <br />Moldboard shall be constructed of 10-gauge A569 steel with a <br />tensile strength of 55,000#-70,000#. <br />Moldboard is to be rolled formed and 100% continuously welded. <br />Overall length of plow moldboard shall be 11'. <br />Height of moldboard is to be minimum of 41" with an 8" cutting <br />edge. <br />Moldboard shall have minimum six vertical support ribs which are <br />to be flame cut, 1/z" A36 steel, with a tensile strength of 58,000# - <br />80,000#, equally spaced across the width of the moldboard. <br />The ribs are to taper from a minimum of 3.5" at the bottom <br />moldboard angle to 2" at the top moldboard angle <br />A 1/z" x 4" x 6" plate is to be welded to the four ribs where the push <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.