Laserfiche WebLink
III�w�n�� ��ir�,�i ��� ,�����iir�iu�„���w�, SxALL BE <br />� AS <br />TYPE DESCRIPTION SPECIFIED <br />(Circle One) <br />Configuration of the forward -facing lights shall be 1st LED amber <br />2nd LED clear 3rd LED amber 4d' LED amber 5th LED clear 6'h LED <br />amber. <br />Configuration of the rear facing lights shall be 1 st LED amber 2nd <br />LED clear Yd LED amber 4h LED amber 5a` LED clear 6d' LED <br />amber. <br />One pair of LED amber oval strobe lights mounted on each side of <br />front corner of cab shield — lights shall be built into the cab shield <br />facing sideways. Cab shield light wires shall be run in solid steel <br />tube for protection on top of cab shield. <br />One pair of LED amber oval strobe lights mounted on each side of <br />body top rub rail. Lights shall be built into the factory body rub <br />rail. <br />Also included will be a pair of Truck Lite LED Model #80880 or <br />equal heated plow lights mounted to stainless steel brackets on <br />hood. Plow lights to LED and integral to OEM headlights. <br />Spreader light: One LED flood light mounted on the rear of the <br />dump body. Location to be approved by Central Services. <br />There shall be one LED mounted spot light for the underbody <br />mounted on the passenger side. Location to be approved by Central <br />Services. <br />Rear Pintle There shall be a Pintle hitch installed on the rear of the unit at the ,"ES NO <br />Hitch: time of delivery.`°'°�'® � <br />Hitch shall incorporate a 1/4" welded steel plate located between the <br />chassis frame rails. <br />There shall be a 25-ton rear pintle hitch Wallace Forge 2044101 <br />installed at a height of 25 %2" from ground and center of truck. <br />Hitch shall have the following 6,000 lbs. maximum vertical load, <br />50,000 lbs. maximum gross trailer load. Drawbar eye dimensions: <br />2" to 3" ID 1 1/4" to 1 5/8" diameter section. There shall also be a <br />2nd pintle hitch installed for off set of pulling leaf vac machines. <br />This pintle shall be installed in manor and measurements specified <br />by South Bend Central Services. <br />17 <br />