BID/PROPOSALro
<br />CITY OF SOUTH BEND
<br />w'
<br />Project
<br />Name: Historic Leeper Park Improvements
<br />- Bid Package
<br />2
<br />Project
<br />Number: 118-010B
<br />For
<br />Bids Due: October 22, 2019
<br />�Md
<br />Contractor
<br />Name: Northern Indiana Construction
<br />Company
<br />Inc.
<br />60
<br />EROSION CONTROL
<br />-..-..__........ _.......
<br />1.00
<br />LS
<br />g 975.
<br />8 975.0
<br />_ 0
<br />61
<br />PED CROSSING SIGNS - RRFB WITH
<br />_....
<br />PUSHBUTTON
<br />3.00
<br />EACH
<br />8, 837
<br />26, 26,511.00
<br />62
<br />PANEL SIGN
<br />4.00
<br />EACH
<br />775.
<br />........
<br />3,100.0
<br />63
<br />LINE, THERMOPLASTIC, BROKEN, WHITE, 4 IN.
<br />53.00
<br />LFT
<br />3,
<br />159.0
<br />64
<br />LINE, THERMOPLASTIC, SOLID, YELLOW, 4 IN,
<br />250.00
<br />LFT
<br />3.
<br />750.0
<br />65
<br />LINE, THERMOPLASTIC, SOLID, WHITE, 6 IN.
<br />295.00
<br />LFT
<br />5.
<br />1,475.0(
<br />66
<br />TRANSVERSE MARKING, THERMOPLASTIC, STOP
<br />LINE, WHITE, 24 IN. .....
<br />14.00
<br />LFT
<br />18.
<br />252.0
<br />67
<br />.........
<br />TRANSVERSE MARKING, THERMOPLASTIC,
<br />CROSSWALK LINE, WHITE„ 24 IN.
<br />205.00
<br />LFT
<br />18.
<br />3,690.0(
<br />68
<br />TRANSVERSE MARKING, MULTI -COMPONENT,
<br />CROSSWALK LINE, WHITE, 24 IN.
<br />322.00
<br />LFT
<br />13.
<br />4,186.0
<br />69
<br />TRANSVERSE MARKING, MULTI -COMPONENT,
<br />SOLID, WHITE, 6 IN.
<br />104.00
<br />LFT
<br />3.
<br />312.0
<br />70
<br />PAVEMENT MESSAGE MARKING, MULTI-
<br />COMPONENT, LANE INDICATION ARROW
<br />. 200
<br />_...
<br />EACH
<br />95..
<br />190.0
<br />71
<br />GROOVING FOR PAVEMENT MARKINGS
<br />........
<br />253.00
<br />LFT
<br />2.35
<br />.........
<br />594.5
<br />72
<br />PAINT
<br />1.00
<br />LS
<br />1
<br />1 r500.0
<br />73
<br />BIKE RACK INSTALLATION
<br />4.00
<br />EACH
<br />215,
<br />860.0
<br />74
<br />-_..
<br />MULCHED NATIVE SEED
<br />....� .._.... ____ ..._ ....
<br />0.50
<br />._
<br />LBS,,,
<br />, 890.
<br />__ 3..................
<br />. 1,945.0(
<br />75
<br />EROSION CONTROL BLANKET
<br />.. w- ..._ ....
<br />53.00
<br />SYS
<br />8.75
<br />463.7
<br />76
<br />._
<br />BOLLARD
<br />2.00
<br />EACH
<br />...........
<br />925.L1,850.0
<br />......
<br />BASE BID TOTAL
<br />813, 360.05
<br />ALTERNATE 1 BID
<br />ITEM
<br />1 INDIANA BOULDERS
<br />QUANTITY I UNIT I UN
<br />117.00 1 TON
<br />ALTERNATE BID TOTAL
<br />Version 1/17/2019 Contractor's Bid for Public Works - 47
<br />ITEM
<br />TOTAL
<br />30,420.00
<br />
|