Laserfiche WebLink
BID/PROPOSAL <br />a „h�� <br />CITY OF SOUTH BEND <br />Project <br />Name: Historic Leeper Park Improvements <br />- Bid Package <br />2 <br />Project <br />Number: 118-010B <br />......... �__...__..._.......... ._... ---------- <br />For Bids Due: October 22, 2019 <br />_..... <br />_ �. . <br />Contractor <br />Name: Northern Indiana Construction <br />Company <br />Inc. <br />BASE BID <br />ITEM <br />QUANTITY <br />UNIT <br />UNIT <br />ITEM <br />COST <br />TOTAL <br />1 <br />CONSTRUCTION ENGINEERING <br />1.00 <br />LS <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />........�.........�.... <br />1.00 <br />�_ <br />LS <br />22 242. <br />22 242.0 <br />..... <br />3 <br />MAINTAINING TRAFFIC <br />1.00 <br />LS <br />g 445 . <br />8 445.0 <br />4 <br />SHRUB, REMOVE <br />11.00 <br />EACH <br />40. <br />440.0 <br />5 <br />TREE, 8 IN., REMOVE <br />1.00 <br />�.. <br />EACH <br />75 <br />..._ <br />75.0 <br />6 <br />TREE, 10IN., REMOVE <br />.........._W <br />1.00 <br />..._. <br />EACH <br />_...... <br />120. <br />120.0 <br />THEmmmmE, 16IN., REMOVE <br />3.00 <br />mm _........ _ <br />EACH <br />._...._.- <br />2...... <br />210. <br />_- .... <br />630.0 <br />8 <br />VE <br />TREE, 28 IN., REMO._....._ _......_ <br />1.00 <br />_..� _, <br />EACH <br />900. <br />... <br />900.0 <br />9 <br />TREE PROTECTION <br />1.00 <br />LS <br />1,000J <br />1,000.0( <br />10 <br />CONCRETE STEPS, REMOVE <br />1.00 <br />LS <br />300. <br />300.0 <br />11 <br />GUARDRAIL, REMOVE <br />52.00 <br />LFT <br />5.60 <br />291.26 <br />12 <br />12 IN. STORM SEWER, REMOVE <br />104.00 .00 <br />LFT <br />50. <br />5 200.0 <br />13 <br />24 IN. STORM SEWER, REMOVE <br />_................ <br />64.00 <br />LFT <br />85 <br />5,440.0 <br />14 <br />CATCH BASIN, REMOVE <br />4.00 <br />EACH <br />950. <br />3,800.0( <br />15 <br />CURB AND GUTTER, REMOVE <br />........ �... <br />312.00 <br />LFT <br />12. <br />3 744.0 <br />16 <br />CURB, CONCRETE, REMOVE <br />274.00 <br />......_ <br />LFT <br />1 <br />3 2$8.0 <br />17 <br />SIDEWALK, CONCRETE REMOVE <br />230.00 <br />SYS <br />15.90 <br />3,657.0( <br />....... <br />18 <br />CONCRETE APPROACH, REMOVE <br />55.00 <br />SYS <br />26.95 <br />1 482.2 <br />19 <br />FENCE, CHAIN LINK, REMOVE <br />-� <br />83.00 <br />LFT <br />11.00 <br />913.0 <br />2.. <br />SALVAGE STEPS <br />....... ........ <br />100 <br />_..._..a <br />EACH <br />1 100 <br />__. <br />_mmmm,1„1.00.0 <br />21 <br />_._._ <br />SALVAGE BENCH <br />_ <br />1.00 <br />X <br />EACH <br />22 <br />DEWATERING <br />�._........... ...... <br />1.00 <br />. <br />LS <br />60, 000 . <br />60, 000.0 <br />23 <br />EXCAVATION, COMMON <br />150.00 <br />CYS <br />85, <br />,750� .... <br />12,750.00 <br />24 <br />BORROW <br />50.00 <br />CYS <br />50" <br />2 500.0 <br />25 <br />SUBGRADE TREATMENT, TYPE II <br />363.00 <br />SYS <br />35. <br />Ll2,705.0 <br />26 <br />COMPACTED AGGREGATE #53, BASE <br />88.00 <br />CYS <br />125, <br />11 ,000.0 <br />27 <br />MILLING, ASPHALT, 1.5 IN. <br />32.00 <br />SYS <br />28 <br />... <br />FOR PATCHING <br />0.0HMA <br />17.00 <br />TON <br />265. <br />:4,5 <br />5 0029 <br />ASPHALT SURFACE <br />3.00 <br />TON <br />925 <br />5.0 <br />Version 1/17/2019 Contractors Bid for Public Works - 45 <br />