My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Opening of Bids - Historic Leeper Park Improvements Project 118-010B - HRP Construction
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Opening of Bids
>
Opening of Bids - Historic Leeper Park Improvements Project 118-010B - HRP Construction
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/8/2025 9:33:40 AM
Creation date
10/23/2019 12:06:19 PM
Metadata
Fields
Template:
Board of Public Works
Document Type
Projects
Document Date
10/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
BID/PROPOSAL �IWW 1" <br />CITY OF SOUTH BENDS a <br />Project Name: Historic Leeper Park Improvements - Bid Package 2 ; <br />Project Number: 118-010B <br />le <br />For Bids Due: October 22, 2019 <br />HRP CONSTRUCT ���_. .-_........._.�__.�._ <br />Contractor Name: ION INC. <br />BASE BID <br />ITEM <br />QUANTITY <br />UNIT <br />UNIT <br />ITEM <br />COST -.-TOTAL <br />1 <br />.... _......_. <br />CONSTRUCTION ENGINEERING <br />- ........ -_. <br />1.00 <br />LS <br />.. <br />�Sncao <br />2 <br />MOBILIZATION AND DEMOBILIZATION <br />1.00 <br />LS <br />_._ . <br />3 <br />MAINTAINING TRAFFIC <br />1.00 <br />LS <br />SHRUB, REMOVE <br />11.00 <br />EACH <br />5 <br />TREE, n81N, REMOVE <br />1.00 <br />EACH <br />..._ <br />3... <br />o0 0 <br />3 ._.. o <br />6 <br />TREE, 10 IN., REMOVE <br />1.00 <br />_ <br />EACH <br />_.._. <br />_._-.._ ...... .... <br />REMOVE <br />TREE, 16IN. REMO u.-,.r .- <br />3.00 <br />_ <br />EACH <br />450•0o <br />_.__w. <br />I .Do <br />8 <br />TREE, 28IN., REMOVE <br />1.00 <br />EACH <br />oa <br />DO.00 <br />9 <br />TREE PROTECTION <br />1.00 <br />LS <br />10 <br />CONCRETE STEPS, REMOVE <br />_. ............. _ ._._........ _....._._.. <br />1.00 <br />LS <br />__o.av_D.or <br />11 <br />GUARDRAIL, REMOVE <br />_ <br />52.00 <br />LIFT <br />� <br />�5, oo <br />iSO.Op <br />12 <br />12 IN. STORM SEWER, REMOVE <br />LIFT <br />FT <br />� <br />13 <br />_w. <br />24 IN. STORM SEWER' REMOVE <br />64.00 <br />LIFT <br />14 <br />CATCH BASIN, REMOVE <br />..._.... .. -. - <br />4.00 <br />EACH <br />oOb 0...... <br />15 <br />_.. <br />CURB AND GUTTER, REMOVE <br />._.._ . __ <br />312.00 <br />- <br />LIFT <br />�a.o0 <br />4 <br />16 <br />CURB, CONCRETE, REMOVE <br />274.00 <br />LIFT <br />ooAl2Q.00 <br />17 <br />SIDEWALK, CONCRETE REMOVE � - <br />-._..... _. �_ <br />230.00� <br />SYS <br />18 <br />CONCRETE APPROACH, REMOVE <br />55.00 <br />SYS <br />a5.00 <br />l 7S• <br />19 <br />FENCE, CHAIN LINK, REMOVE <br />83.00 <br />LIT <br />30, Do <br />o , 'TO. <br />20 <br />SALVAGE STEPS <br />1.00 <br />EACH <br />21 <br />SALVAGE BENCH <br />1.00 <br />EACH <br />35p,pa <br />35D•oa <br />22 <br />_. <br />DEWATERING <br />- ..m <br />1.00 <br />_ .. <br />LS <br />_ Avo.00 <br />O,o <br />23 <br />EXCAVATION, COMMON <br />_...... _u -. _......... __ <br />150.00 <br />CYS <br />o <br />24 <br />BORROW <br />_ <br />50.00 <br />CYS <br />25 <br />SUBGRADE TREATMENT, TYPE II <br />363.00 <br />SY5 <br />aS,OD <br />_U .5.o <br />26 <br />COMPACTED AGGREGATE #53, BASE <br />88.00 <br />CYS <br />3j, oo <br />.O <br />._...._ <br />27 <br />_._ <br />MILLING, ASPHALT, 1.5 IN, <br />_ <br />32.00 <br />SYS <br />ova o„0 <br />3 ice.cc <br />mm <br />28 <br />HMA FOR PATCHING <br />17.00 <br />TON <br />rF W-0(o <br />w, <br />29 <br />ASPHALT SURFACE <br />3.00 <br />TON <br />-p <br />l <br />Version 1/17/2019 Contractor's Bid for Public Works - 45 <br />�0 <br />
The URL can be used to link to this page
Your browser does not support the video tag.