Laserfiche WebLink
b'. Arch <br />staff report <br />tural servic <br />structures i <br />basis of $8. <br />service on a <br />not exceed $ <br />cf 5.hours o <br />to be rehabi <br />in our inclu <br />Lpon the mot <br />voted that t <br />minimum of $ <br />the contract <br />on some spec <br />work.- <br />itectural Services Contract, LaSalle Park, R -57. The ARCHITECTURAL <br />?d on a proposa from Danie `Snyder to furnish architec- SERVICES CON- <br />%s to property owners who have to rehabilitate their TRACT PROPOSAL, <br />r the LaSalle Park Project. The charges would be on "the LASALLE PARK, <br />)O per hour, but not to exceed more than -5 hours of ,R -57 <br />ry particular structure. The total.contract cost would <br />i,000 which would be .equi•valent to-spending a'.._maximum <br />1 125 structures.' There are approximately 300`structures <br />Iitated. It was stated that the architect was interested: <br />ling a minimum contract amount of approximately-$3,000., <br />ion by Mr:! Kompar, secorided;by Mr. Chenney,. the Commission <br />ie staff negotiate a contract with Mr. Snyder, with a <br />?,500 and a maximum of $5,000, with the inclusion in <br />document that assignments might be made by the staff <br />ification preparation and some supervision of rehabilitation <br />c. Engineering Services Contract, LaSalle Park, R -57. The Chas. W.ENGINEERING <br />Cole Company reports that the topographical survey is finished, approxi- PROGRESS REPORT, <br />mately 30 sheets of street plans have been drawn, and;the.soil data has.LASALLE PARK, <br />been reviewe and analyzed, and.that,a detailed soil analysis be R -57 <br />contracted for. The engineers have secured a proposal for additional <br />soil borings and analysis at a cost of $4,100, and the staff suggested <br />at least one additional proposal. The - engineers also have analyzed the <br />sewerage system, and reports that to separate the storm and sanitary <br />sewers it would cost at this time approximately $330,000. <br />d. Rehabilitation "before and after" Photographe, LaSalle Park,R- 57_._REHABILITATION <br />It is necessary for the staff to keep good records of the inside and PHOTOGRAPHS, <br />outside building conditions, and since the staff if not equipped to LASALLE PARK, <br />complete this work, proposals have been solicited and received for R -57 <br />50 buildings, 2 inside photos and 1 outside photo. To date, -the propo- <br />sals range from $450 to $300. The staff will akk for Commission <br />action on this matter at a later date. <br />e. Fires, LaSalle Park, R -5,7. The staff has been disturbed FIRES, LASALLE <br />because of the number of fires in the LaSalle Park Project area. PARK R -57 <br />Therefore, letters have been sent to all people who have not yet sold <br />their property to the.Redevelopment Department, notifying them that <br />Chief McHenry of the South Bend Fire Department, and the-Redevelopment <br />Department, will advise the residents on what precautiors could be <br />taken to avoid fires. This letter was sent out for the protection <br />of the residents, and also to explain that payment to owners might <br />be cut down beft8e of fire damage. <br />f. Parcels for Condemnation, LaSalle Park,R -57. The staff has PARCELS FOR POS- <br />prepared a list of 10 parcels for condemnation, and must now consult SIBLE CONDEMNA-LL <br />with legal counsel before coming to the Commission for action. These eT0N, LASALLE <br />people have told the Redevelopment Department they want us to condemn, PARK, R657 <br />or that they are not going to sell. - <br />g. Street Pattern MeetingsAffectin Central Core, R -66. Mr. Chong MEETING RE <br />reported th t City Planning Associates and the Redeve opment Department STREET PATTERNS, <br />-5- <br />