My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 3 - SRTS LaSalle Intermediate and Marquette Primary Project No 116-040 - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 3 - SRTS LaSalle Intermediate and Marquette Primary Project No 116-040 - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:57:41 PM
Creation date
10/23/2019 11:41:10 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Contract No:R -39514 <br />Change Order No:003 <br />Contract: <br />Project: <br />Change Order Nbr: <br />INDIANA <br />Department of Transportation <br />R -39514 <br />1600076 - State:160007600LC4 <br />003 <br />Change Order Description: Over Under Change Order <br />Reason Code: PAYMENT ADJUST, Material Related <br />Date:10/07/2019 <br />CLN PCI PLN Item Code Unit Unit Price ® COgt Comment� Amon Y unl Change <br />Page: 3 <br />0022 1600076 0022 207-08264 SYS 31.480-730.730 C Amount:$-23,003.38 <br />Item Description: SUBGRADE TREATMENT, TYPE II <br />Supplemental Descriptionl: <br />Supplemental Descriptionl: <br />0024 1600076 0024 304-07490 TON 256.210-163.670 C Amount:$-41,933.89 <br />Item Description: HMA PATCHING, TYPE B <br />Supplemental Descriptionl: <br />Supplemental Descriptionl: <br />Total Value for Change Order 003 = $-64,937.27 <br />Whereas, the Standard Specifications for this contract provides for such work to be performed, the following change Is recommended. <br />General or Standard Change Order Explanation <br />This change order is being created to address Items that overran and underran by more than $20,000.00 or more. Please see items listed below. <br />Underrun Adjustment Item 207-08264 CLN-PLN 0022 Sub grade Treatment Type II Tlae orignial plan quanity was calculated assurruing trio widths <br />and lenghts of the approaches were what was assumed measurrnents in the plans. When the contractor started removing and placing sub -grade <br />in the appraoches the acutal field measurmenis taken and calculated came up less than shown in plans. This result caused the item to undarrun <br />on this project item in a quanity of-730.73 sys which results in a underrun by - $23,003.38. Underrun Adjustment Item 304-07490 CLN-PLN 0024 <br />PIMA Patching, Type B The plans called for 2 LFT of asphalt removal tar patching at every, inteseclion where curia and curb ramps were called for <br />removal. During the curb and curb ramp removal, I noticed some inters+ectioris still had eusiting ;asphalt in good shape, t sugguested to City of <br />South Bend„ that not all Intersections need to have the aspht removed 2 LFT called out in the plans„ I sugguuested we only remove the necssary <br />ashalt need up to 2 LFT or less which would same the contract money, The City of South Bend agreed„ as a result caused the item to underrun on <br />06s project item in a quantily at -163.67 tons whlch results In a underrun by-$41,933.89. The total of this change order under -run is-$64,937.27. <br />Which reflect all item that underran and overran by $20,000 or more. This change order address over and under runs assocaled with the project <br />there is no additional time required for this change order. <br />Change Order Explanation for Specific Line Item <br />............................................. ......... ...................................................................... <br />It is the intent of the parties that this change order is full and complete compensation for the work describe above. <br />Notification and consent to this change order is hereby acknowledged. <br />Contractor ____ l rt 1 U t •.� ....... Signed BYw. -r <br />NOTE: Other required State and FHWA signatures will be obtained electronically through the SlteManager system. <br />
The URL can be used to link to this page
Your browser does not support the video tag.