My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 2 - SRTS LaSalle Intermediate and Marquette Primary Project No 116-040 - American Structurepoint
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 2 - SRTS LaSalle Intermediate and Marquette Primary Project No 116-040 - American Structurepoint
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:54:44 PM
Creation date
10/23/2019 11:36:17 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
I have an LPA contract with the City of South Bend that would like to do some additional work and I <br />fold them I would ask to see if FHWA would participate in something like this. There is an email below <br />from the City but I will also explain my understanding and concerns. <br />This is a safe routes to school project where we replaced curb ramps and sidewalk. The project <br />completion date is now past but there is a savings in the contract where the City would like to use <br />the additional funds to replace some additional sidewalk pieces that are still in poor condition <br />between locations that have already been replaced. If this change were allowed they would stay <br />under the surplus that they currently have (around $60k), it would also require a change order for <br />additional time. If you think this acceptable or not could you approve or disapprove of this change? <br />Thank You! <br />Ryan Forgey, PE <br />Area Engineer <br />LaPorte District <br />0: (219) 325-7546 1 C: (219) 380-4709 <br />E. rfryr"r1iat.rn.gra <br />From: Kyle Silveus [Mailto:ksilvtus southbgndivj', <br />Sent: Thursday, August 22, 2019 2:03 PM <br />To: Forgey, Ryan <jtF rgey& dott IN, o > <br />Subject: DES 1600076_LaSalle/Marquette SRTS_Additional Sidewalk Request <br />**** This is an EXTERNAL email. Exercise caution. DO NOT open attachments or click links from <br />unknown senders or unexpected email. **** <br />Ryan, <br />The City of South Bend desires to remove and replace some additional sidewalk in very poor condition in select areas <br />within the project limits due to some cost savings on other items. Additional sidewalk that would be replaced would be <br />in areas that were desired to be included in the project but were not, due to budget. Is this something that could be <br />allowed by FHWA? The intermediate completion date for the project is today, 8/22/19, with Final completion set for <br />4/30/20. <br />Thank you for your consideration, <br />10 <br />Kyle Silveus, P.E. <br /><, Assistant City Engineer <br />C Division of Engineering <br />1316 County -City Building <br />227 West Jefferson Boulevard <br />IsO South Bend, Indiana 46601 <br />(574)235-9083 <br />
The URL can be used to link to this page
Your browser does not support the video tag.