My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 & PCA - Liberty Tower Improvements Div A Project No 118-086R - Slatile Roofing
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Order & Project Completion Affidavits
>
Change Order No 1 & PCA - Liberty Tower Improvements Div A Project No 118-086R - Slatile Roofing
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 10:59:24 AM
Creation date
10/23/2019 11:34:41 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
Proposal Request #01 <br />Date: May 22, 2019 <br />To: Michael Albert, Slatile Roofing & Sheet Metal Co., Inc. <br />From: Dan vonBergen, Kil Architecture/Planning <br />RE: Liberty Tower Exterior Renovations Div. A <br />KAP Project: 18054 <br />Dept. Public Works Project: 118-086R <br />The Owner requests an itemized proposal for changes to the Contract Sum and Contract Time for proposed <br />modifications to the Contract Documents described herein. The Contractor shall submit this proposal within <br />10 days or notify the Architect in writing of the anticipated date of submission. <br />THIS IS NOT A CHANGE ORDER, A CONSTRUCTION DIRECTIVE, OR DIRECTION TO PROCEED WITH <br />THE WORK DESCRIBED IN THE PROPOSED MODIFICATIONS. <br />1. Omit 11 openings cut in roof deck per Sheet A1.2, Upper Roof Demolition Plan, Demo <br />Keynote 4. <br />2. Omit curbed and capped roof opening enclosures per Sheet A1.2, Upper Roof Proposed Plan, <br />Roof Keynote 4 and Sheet A2.1, Detail 3, Curb & Cap @ Future Duct. <br />3. Omit Raised Bulkhead @ Penthouse Door per Sheet A1.2, Upper Roof Proposed Plan, Roof <br />Keynote 3 and Sheet A2.2, Details 1 & 2. <br />Itemize labor, materials, equipment and other costs as required by the Owner -Contractor Agreement. <br />Attachments: <br />None <br />K I L <br />ARCHITECTURE <br />PLANNING <br />wvnv.kiIgghitecture@ com <br />1126 LINCOLNWAY EAST SOUTH BEND IN 46601 (574) 288,2654 VOICE 289, 2420 FAX <br />
The URL can be used to link to this page
Your browser does not support the video tag.