My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Tech Resource Center Low Voltage Installation Project No 118-090 - Brite Electric Inc
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Tech Resource Center Low Voltage Installation Project No 118-090 - Brite Electric Inc
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:49:54 PM
Creation date
10/23/2019 11:32:36 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
4
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
'40 <br />DEPARTMENT OF PUBLIC WORKS <br />DIVISION OF ENGINEERING <br />Project Number: 118-090 Project Name: ���"�"��`Bawd°w..R.��"`�""�"�"°`�°"�� Change Order#: <br />DATE INITIATED 9-5-19 <br />BPW DATE: 10-22-19 <br />Brief Summary of Change Order; (Construction Change, Alternative, Substitution, Differing Instructions, Out of Scope, Etc.). <br />Data ports were added to meet end user requirements. <br />Attachments: (List documents support change — required) <br />N/A <br />Amount of eIncrease / El Decrease: $2,850.00 <br />mmmmITW <br />.............. <br />- <br />_'... <br />Categories (Pick One): <br />Previously approved Change Order(s): $ 0.00 <br />8 Scope of Work <br />7.94mm <br />-- ❑ Differing Site Conditions, Changed Conditions <br />Current Percent of Change: -• <br />El Conflicted Specifications and Drawings <br />38,750... .... <br />New Total Amount: $ .00 <br />❑Failed Materials <br />❑ Error <br />7.94 <br />❑ Omission <br />Total Percent of Change: ---••• •••---• <br />❑ Final Quantity Adjustment <br />Funding Secured From: 214 04-It- 415, t) <br />(filled out by PM) -T-r Ptof, , (: <br />RECOMMENDED BY: <br />Dan Jones <br />t <br />� PA - <br />(q <br />Project Inspector (Print Name) <br />Signature)' <br />(Date) <br />REVIEWED BY: <br />Toy Villa <br />CLA <br />to. <br />Construction Manager (Print Name) <br />(Signature) <br />(Date) <br />APPROVED BY: <br />Zach Hurst <br />Engineering Project Manager (Print Name) <br />(Signature) <br />(Date) <br />APPROVED BY: <br />Kara Boyles <br />Q <br />loll <br />City Engineer (Print Name) <br />(Si nat�rr) <br />(Dag <br />
The URL can be used to link to this page
Your browser does not support the video tag.