Project Instrumentation and Control <br />Credit: $13,808.00 <br />Delete the RSlogix studio license and spare parts from the project requirements. <br />Relocate Generator and Transfer Switch <br />Credit: $36,120.00 <br />Relocate the Generator and transfer switch to the southwest side of the building. The feed for the <br />existing 480 volt panel will be ran underground. Required separation between the MAU and the <br />building will be maintained. <br />Demolition, equipment installation and process piping labor savings <br />Credit: $12,783.00 <br />Division 1 project oversight <br />Credit: $24,082.00 <br />Bowen will still meet the requirements of the specifications as it relates to project oversight. <br />Delete Bollards <br />Credit: $1,200.00 <br />Delete four (4) new bollards from the project. Existing bollards to remain. <br />Clarifications: <br />- Bowen has assumed the facility can be taken out of service and no temporary piping is necessary. <br />- Bowen has assumed contract award and notice to proceed will be issued before the end of the year. <br />- Bowen has not included a jobsite office trailer or temporary facilities other than sanitary facilities. <br />- Concrete supplied shall be from the local ready mix supplier and will be their standard 4000 psi air <br />entrained mix design. No special testing for mix design approval has been included. <br />- Bowen has assume vent piping penetrations and through wall piping can be reused if feasible. <br />Please review and if you have any questions, please let me know. Thank you for your consideration. <br />Respectfully„ <br />Patrick Stanfor <br />Project Manag <br />y'n, rix tit.' um <br />8802 North Meridian St. • Indianapolis, IN 46260 • 317.842.2616 phone • 317.841.4257 fax • www.BowenEngineering.com <br />