My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Change Order No 1 - Olive Water Treatment Plant Improvements Project No 118-024 - Bowen Engineering
sbend
>
Public
>
Public Works
>
Board of Works Documents
>
2019
>
Change Orders
>
Change Order No 1 - Olive Water Treatment Plant Improvements Project No 118-024 - Bowen Engineering
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/7/2025 12:49:02 PM
Creation date
10/23/2019 11:30:06 AM
Metadata
Fields
Template:
Board of Public Works
Document Type
Contracts
Document Date
10/22/2019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
Show annotations
View images
View plain text
October 10, 2019 <br />Heather Cheslek P.E. <br />Black & Veatch <br />125 Ottawa Avenue <br />Grand Rapids, MI 49503 <br />RE: South Bend, Olive WTP Value Engineering Proposal <br />Heather, <br />Per your request I have listed the cost saving ideas that the Owner has selected from the previous <br />proposal. <br />Delete Gravel Staging Area. <br />Credit $3,460.00 <br />Bowen does not anticipate needing to disturb this area. Minimal space will be require for storage as most <br />equipment will be installed on delivery. Bowen will work with the City to find alternative parking areas <br />that will not interfere with the operation of the plant. <br />Delete Erosion Control, Seeding and Site Restoration <br />Credit $7,917.00 <br />Since the site will require minimal soil disturbance silt fencing will not be provided as shown on the <br />drawings. A small amount of inlet protection if necessary will be provided. Areas disturb by excavation <br />will be rough graded. No seeding or restoration of the gravel drive has been included. <br />Reuse Chemical Unloading Station <br />Credit $4,306.00 <br />If the new chemical lines can be rerouted so that the existing unloading station can remain intact and the <br />old lines can be abandon in place then a credit will be provided. <br />Reuse Existing Man Doors. <br />Credit $5,243.00 <br />Existing man doors are in good shape and are fire rated. Existing doors will receive two coats of paint. <br />Delete Water Heater, Appurtenances and Piping <br />Credit $14,833.00 <br />The hot water system and piping will be deleted. A pressure tank will be substituted (size to be <br />determine) to provide tepid water to the safety showers. <br />r o c°rim rye- wim- <br />8802 North Meridian St. • Indianapolis, IN 46260. 317.842.2616 phone • 317.841.4257 fax • www.BowenEngineering.com <br />
The URL can be used to link to this page
Your browser does not support the video tag.